Open But Secure

Located in one of the toughest areas in South Central Los Angeles the Animo South Los Angeles High School, a new public charter high school for 630 students, is visually open but entirely secured. The area was a central trouble spot during the 1964 Watts and the 1992 Rodney King Riots. Fair Housing and school busing has plagued the area since the early 60s, where median family income is less than $35,000/year and 25 percent of the population lives below the poverty level.

On July 22, 2014, a massive fire broke out and destroyed half of the campus. This new replacement building contains 11 classrooms, two science labs, faculty lounge, new administrative and counseling offices, and public courtyard space for student gatherings and activities.

South Los Angeles High is a progressive, public charter high school known for its collaborative, curriculum and strong community connection. This building and addition to the 1950s campus creates a flexible teaching environment that supports significant parental involvement and puts student life at the center of the school and unites the campus community.

Designed on an extremely limited budget and aggressive schedule, simple cost-effective gestures were deployed in the use of cladding, fenestration, color and transparency to create a memorable sense of richness, providing a bright moment in an extremely tough inner-city community.

Unlike most school that are enclosed by a property line security fence, the South Los Angeles High School building is surrounded by a 20-foot-high perforated bullet-resistant metal walls that are integrated into the building design. This creates light filled courtyards for outside activity that is connected directly to classroom activities. This arrangement of courtyard design allows the building to breathe fresh air and daylight while providing a safe and secure environment for leaning and social engagement. Open-air light-filled halls and classrooms, as well as the building transparency, express the school’s values and provide a healthy, sustainable learning environment. The building form and primary courtyard are formed by a series of required clearances around an oil well abandoned in the late 1970s, a series of power line and utility easements, height restrictions, and zone changes running through the site that constrain the form and size to its maximum possible building-area envelope.

The perforated anodized aluminum façade panels of the building create an ever-changing screen that sparkles in the sun and glows at night, while simultaneously providing shade to cool the building, reducing noise, enhancing privacy, and still allowing for views, great natural light, and ventilation that pass through its millions of perforations. The material reappears as a strategic arrangement of screens around the building, lending a subtle rhythm to the exterior circulation. The walls filter direct sunlight that lends unexpected visual depth while creating a sense of security for the occupants. Enhancing the structure’s geometric texture, the irregular array of openings variably extrudes from the building’s surface. Its unique architectural form and integrated function creates a high-performing building that is an expression of the people who live there and the environmental and cultural context in which it is built.

The cost of the 18,000 square-foot project was $3,300,000.00. Brooks + Scarpa served as the lead architectural firm. Franco + Associates served as associate architect. Construction was done by Blackwell Construction, Inc.

Featured

  • Texas District Finishes Construction on New Middle School, Admin Building

    The Westwood Independent School District recently held a ribbon-cutting ceremony for the new Westwood Middle School and Administration Building in Palestine, Texas, according to a news release. The campus covers 106,000 square feet and has the capacity for 650 students in grades 6–8, and it will also play home to the district’s staff and administration.

  • New eBook Shares Guidelines on Building CTE Centers

    Career and Technical Education (CTE) curriculum and resources provider iCEV recently announced the publication of a new eBook sharing guidance and insights on building new CTE facilities, according to a news release.

  • California District Starts Construction on New Robotics Facility

    The Fremont Union High School District (FUHSD) near Silicon Valley, Calif., recently announced that construction has begun on a new Robotics Facility on the campus of Cupertino High School, according to a news release. The 14,500-square-foot facility will serve students at high schools across the entire district, providing purpose-built spaces for student creativity and collaboration.

  • Pittsburgh High School Upgrades Athletics Facilities’ Technology

    Plum Senior High School in Pittsburgh, Penn., recently partnered with South-Dakota-based Daktronics through the We’re All Mustangs Here Foundation to upgrade the technology in its athletics facilities, according to a news release. Daktronics designed, built, and installed new LED video displays and finished the project in time for the beginning of the 2025 high-school football season.

Digital Edition