Groundbreaking held for Shepaug AgSTEM Project

Washington, Conn. – A groundbreaking was recently held to kick off the Shepaug Valley (Region 12) Regional Agriscience STEM Academy project in Washington, Conn.

Shepaug AgSTEM Project

The project includes the construction of a new, 52,000-square-foot Agriscience STEM center that will include classrooms, laboratory space (food science, plant science, veterinary science, small animal and computer labs), storage areas, outbuildings, animal growing rooms, offices, meeting rooms, and indoor riding/demonstration areas. The facility will support the school’s new AgSTEM program that will serve 139 students from the region.

The O&G Industries’ Building Group is the Construction Manager for the project. Kaestle Boos Associates is the project architect. The project will be completed in the winter of 2019.

Shepaug AgSTEM Project

Featured

  • Niles West High School Natatorium Renovation

    Natatoriums are highly specialized spaces, and luminaires in this setting face several unique challenges. Perhaps the most significant is corrosion, which is exacerbated by high indoor humidity, condensation, and pool chemicals, often resulting in material degradation in luminaires not certified to perform in corrosive environments.

  • NWEA Report Recommends K–12 Natural Disaster Recovery Strategies

    The Northwest Evaluation Association (NWEA), a K–12 assessment and research organization, recently announced the release of a new playbook for schools and communities recovering from extreme weather events, according to a news release.

  • Little Grand Market

    Designing for Belonging: Why Student Wellness Starts with Space

    From walkable site planning to flexible interiors, intentional design choices play a critical role in how students experience comfort, connection, and community.

  • Full Sail University Announces First Student Housing Facility

    Full Sail University in Winter Park, Fla., recently announced that development has begun on its first student housing community, according to a news release. The university is partnering with Nvision Development for construction and long-term management of the facility, which will stand five stories and have the capacity for more than 570 beds.