Choice Career High School

WRA Architects

Project of Distinction 2019 Education Design Showcase

Choice Career High School

Project Information

Facility Use: High School
Project Type: New Construction
Category: Classrooms/Academic Buildings
Location: Mesquite, TX
District/Inst.: Mesquite ISD
Chief Administrator: Dr. David Vroonland
Completion Date: Fall 2021
Gross Area: 250,000 sq. ft.
Area Per Student: 125 sq. ft.
Site Size: 44 acres
Current Enrollment: 0
Capacity: 2,000
Cost per Student: $34,750
Cost per Sq. Ft.: $278
Total Cost: $69,500,000

Mesquite ISD’s Choice Career High School is the centerpiece of the district’s plan to address the growing population of students in its existing five high schools. This new campus will offer a unique option for a career- focused education to high school students from across the district and will serve as the home campus for those students who choose this path. The 250,000-square-foot campus will feature four schools with multiple programs within each: School of Technology, School of Engineering, School of Construction Science, and School of Health Sciences.

Choice Career High School Choice Career High School

The charge was to relieve the population growth at the five current high schools with the formation of a new Career & Technical Education (CTE) high school. District administration requested that the school must be designed for a maximum enrollment of 2,000 students in grades 9 through 12. The school is scheduled to open for the Fall semester of 2021.

During the programming, planning, and design, phases, the WRA team hosted a Design Charrette process with the CTE Committee, District staff, community members, and parents. The process put people into teams with boards and cut-out shapes representing various spaces in the building. The groups were asked to lay out an arrangement for their “dream career school” based on the curriculum, spaces, and elements that they thought were important. Each group presented their ideas to the larger group, with a vote at the end using sticker dots. The charrette helps WRA truly listen to users and fully understand their input.

Dr. David Vroonland, Mesquite ISD superintendent of schools, participated heavily in the design process saying, “This is a really exciting time for Mesquite ISD. We’re going down a road, an adventure if you will, in this new design that very few have gone down. I’m so excited for our children, in terms of the opportunity that they are going to be presented in just a few short years. I’m excited for what this school means for our community, because I really think it will drive economic opportunities as students begin graduating.”

Choice Career High School Choice Career High School

Dr. Vroonland went on to say, “I’m excited about the collaboration that is going to occur between our community and our high school in ways that it isn’t occurring now – that I think is going to be born out of this effort. And I’m really excited about what it’s going to look like. I think it’s going to be a high-profile building for our community and something that will make us proud, not only tomorrow, but way down in the future as well.”

After deciding on a conceptual configuration through the design charrette process with district and committee members, WRA recommended the following design goals, which were approved by the district and used to develop design concepts for the new school.

  1. Respect Mesquite ISD’s budget
  2. Functional success (Satisfy the Program)
  3. Respect the unique topography of the site and the context of the immediate surroundings
  4. Security (both exterior and interior)
  5. Aesthetic similar to a higher education campus without compromising functionality
  6. Daylighting (especially in the classrooms), views, sustainability
  7. Thoughtful consideration of the users’ experience of the building
  8. Plan layout centered around the teaching of career-specific skills in project-based learning environments

Choice Career High SchoolWRA’s unwritten goals, which are appropriate to mention here, are to create an environment conducive to learning and teaching. Designing a building to sustain long term value and energy efficiency spearheaded the major goals used in designing the aesthetic and functional layout of the building. Furthermore, WRA always designs with the goals of long and short-term value, budget consciousness, educational appropriateness, durability, and energy efficiency.

Judges Comments

Nice concepts. Good use of volume in common spaces. Impressive design charrette process. Good overarching goals. Should resubmit when construction is complete.

Architect(s):

Choice Career High SchoolWRA Architects
GRAHAM BAUMANN, AIA
214/750-0077

Featured

  • University of Kentucky Receives $150M Gift Toward New Arts District

    The University of Kentucky’s Board of Trustees recently received a $150-million gift from The Bill Gatton Foundation, according to a university news release, to build a new arts district on the campus in Lexington, Ky. The new district will feature a new College of Fine Arts building and a multi-hundred-seat theater, among other amenities.

  • Hawaii Elementary School Breaks Ground on New Classroom Building

    Kealakehe Elementary School in Kailua, Hawaii, recently began construction on a new, $16-million classroom building for its campus, according to a news release. The 13,000-square-foot building will stand two stories and connect the existing upper and lower campuses.

  • Indiana Wesleyan University Schedules Grand Opening for New Welcome Center

    Indiana Wesleyan University recently announced that it will soon open a new Welcome Center on its campus in Marion, Ind., according to a news release. The facility will serve as the home base for prospective students and their families to learn more about the university and student life there. A ribbon-cutting ceremony is scheduled for February 19.

  • UNT Dallas Holds Ribbon-Cutting Ceremony for $100M STEM Building

    The University of North Texas at Dallas in Dallas, Texas, recently celebrated the opening of its new, $100-million STEM Building, according to local news. The ceremony on Dec. 2 preceded the first day of classes in the facility on Jan. 12, 2026.

Digital Edition