Video Power Comes to University Locker Room

video wall

A renovation of the Tigers’ locker room at the University of Memphis included the installation of a system that offers cost-effective, reliable video distribution to video walls and large displays.

Tasked with creating a unique atmosphere in the University of Memphis Tigers’ locker room at the Liberty Bowl Memorial Stadium in order to wow recruits and pump up players before games, Miestro Home Integration relied on Just Add Power’s (J+P) Ultra HD over IP video distribution system to cost-effectively and reliably distribute video content to a variety of video walls and large displays.

The university’s new installation enables seamless switching between any resolution HDMI source as well as uncompressed lossless multichannel audio formats, including Dolby Atmos support. Video wall functionality is built-in for displays installed in portrait and flipped configurations as well as image push, pull, and pop features. An integrated scaler on the receiver automatically adjusts the picture to fit the screen.

The J+P platform is engineered to provide complete scalability, so expanding the system with an additional screen or source is as simple as adding another receiver or transmitter. This was an important feature for the university, as the locker room also features 105 standalone displays—one above each locker—in addition to three additional touchscreens. With an eye on future expansion, the standalone locker displays and touchscreens have been prewired for inclusion in the J+P system.

“In college football, winning requires elite talent and it’s no secret that many schools will go to extraordinary lengths each year to get it,” says Taft Stricklin, sales team manager at J+P. “This installation showcases that AV technology can be used to differentiate a football program from the pack and wow recruits, while highlighting the important role that reliable and flexible video distribution plays in creating these environments.”

This article originally appeared in the College Planning & Management June 2019 issue of Spaces4Learning.

Featured

  • Rethinking K-12 Schools as a Continuous Learning Experience

    Most students move through three or more separate facilities during their K-12 journey, yet the built environments they encounter at each stage have traditionally been designed in isolation, with little continuity in spatial language, learning philosophy, or physical resources. Each new school is a reset with different layouts, learning models, expectations, and ways of moving through a building. The next generation of school design is making the case that the first day of kindergarten and the last day of high school can and should feel connected through common support systems and infrastructure in the physical environment.

  • Montclair State University Debuts New VR Facility

    Montclair State University in Montclair, N.J., recently announced the completion of a new virtual reality learning facility developed in partnership with Dreamscape Learn, according to a news release. The 2,450-square-foot lab space is inside the College of Communication and Media building and will serve students pursuing careers in digital media, virtual reality, and content creation.

  • California District Opens New Continuation High School

    The Fort Bragg Unified School District (FBUSD) in Fort Bragg, Calif., recently held a ribbon-cutting ceremony for Noyo High School, a continuation high school that provides alternative education options for students in grades 6–12, according to a news release. The district partnered with Quattrochi Kwok Architects for design and FRC Inc. for construction, and the project’s funding came from Local Bond Measure B.

  • DLR Group Hires Three for Higher Education Practice

    Integrated design firm DLR Group recently announced that it has brought three new hires on board to help shape its higher education practice in California and the northeast, according to a press release.