Clayton County College & Career Academy

To help high school students explore career and higher education opportunities, Clayton County Public Schools (CCPS) is establishing a College and Career Academy in Morrow, a suburb south of Atlanta, Georgia. Phase 1 of the academy prepares students for careers and training in aviation mechanics/avionics, artificial intelligence (including drones and robots), distribution and logistics and culinary arts pathways. Cooper Carry is providing design services to demolish a portion of the existing Morrow High School and provide an addition that will support CCPS in realizing its vision for the academy.

Going beyond a standard high school design, the new facility design takes its cue from the airfoil – the cross-sectional shape of an airplane’s wing. The two-wing form incorporates a central courtyard that is just as significant to the campus as the building’s interior spaces. With clean sweeping lines, aerodynamic detailing and a play on opaque and transparent surfaces, the school design aims to inspire students, faculty, and staff in the discovery process, while also providing practical, hands-on education. In addition to general classrooms, faculty and staff offices and common areas, the building includes an aircraft hangar, a flight simulation room, culinary classrooms, and robotics laboratories.

 For more information, visit www.coopercarry.com/projects/clayton-county-college-career-academy.

Featured

  • St. Lucie County, Fla., Breaks Ground on New K–8 School

    St. Lucie Public Schools in St. Lucie County, Fla., recently held a groundbreaking ceremony for a new K–8 school, according to a news release. The district partnered with Spiezle Architectural Group, Inc., for the design of the upcoming Ft. Pierce K–8 School, which comprises six buildings covering 215,000 square feet.

  • California District Opens New Continuation High School

    The Fort Bragg Unified School District (FBUSD) in Fort Bragg, Calif., recently held a ribbon-cutting ceremony for Noyo High School, a continuation high school that provides alternative education options for students in grades 6–12, according to a news release. The district partnered with Quattrochi Kwok Architects for design and FRC Inc. for construction, and the project’s funding came from Local Bond Measure B.

  • Texas A&M Opens First Building at Fort Worth Campus, Breaks Ground on Research Facility

    The Texas A&M University System marked a major milestone in the development of its Fort Worth campus by opening its first completed academic building and breaking ground on a second facility designed to expand research and industry collaboration.