Clayton County College & Career Academy

To help high school students explore career and higher education opportunities, Clayton County Public Schools (CCPS) is establishing a College and Career Academy in Morrow, a suburb south of Atlanta, Georgia. Phase 1 of the academy prepares students for careers and training in aviation mechanics/avionics, artificial intelligence (including drones and robots), distribution and logistics and culinary arts pathways. Cooper Carry is providing design services to demolish a portion of the existing Morrow High School and provide an addition that will support CCPS in realizing its vision for the academy.

Going beyond a standard high school design, the new facility design takes its cue from the airfoil – the cross-sectional shape of an airplane’s wing. The two-wing form incorporates a central courtyard that is just as significant to the campus as the building’s interior spaces. With clean sweeping lines, aerodynamic detailing and a play on opaque and transparent surfaces, the school design aims to inspire students, faculty, and staff in the discovery process, while also providing practical, hands-on education. In addition to general classrooms, faculty and staff offices and common areas, the building includes an aircraft hangar, a flight simulation room, culinary classrooms, and robotics laboratories.

 For more information, visit www.coopercarry.com/projects/clayton-county-college-career-academy.

Featured

  • New Arizona Fine Arts School Reaches Construction Milestone

    Construction of the new Hilltop School for the Arts and Theater in Litchfield Park, Ariz., recently hit a significant milestone, according to a news release. The Agua Fria High School District held a beam-signing ceremony to celebrate the building’s topping out, or the placement of its last structural beam.

  • How a Portable Sink Helped an Art Classroom Run More Smoothly

    Classroom design decisions can have outsized effects on instructional time and safety at schools juggling mismatched infrastructure, strict budgets, and crowded schedules — particularly in the arts. Between spilled paint and dirty brushes, art classes run smoother with a sink in the studio. But many schools don’t have a sink in every art classroom.

  • Colorado School District Breaks Ground on Unified PK–12 Campus

    The Haxtun School District No. Re-2J in Haxtun, Colo., recently announced that ground has been broken on a renovation/addition project that will unite its two schools, Haxtun Elementary and Haxtun Jr/Sr High School, according to a news release.

  • Deferred Maintenance Issues Growing at Universities, Gordian Reports

    U.S. colleges and universities are falling increasingly behind on facilities maintenance and repair, according to Gordian’s 13th annual State of Facilities in Higher Education report. The deferred capital renewal burden has reached $156 per gross square foot, an 8% increase over the previous year.