Clayton County College & Career Academy

To help high school students explore career and higher education opportunities, Clayton County Public Schools (CCPS) is establishing a College and Career Academy in Morrow, a suburb south of Atlanta, Georgia. Phase 1 of the academy prepares students for careers and training in aviation mechanics/avionics, artificial intelligence (including drones and robots), distribution and logistics and culinary arts pathways. Cooper Carry is providing design services to demolish a portion of the existing Morrow High School and provide an addition that will support CCPS in realizing its vision for the academy.

Going beyond a standard high school design, the new facility design takes its cue from the airfoil – the cross-sectional shape of an airplane’s wing. The two-wing form incorporates a central courtyard that is just as significant to the campus as the building’s interior spaces. With clean sweeping lines, aerodynamic detailing and a play on opaque and transparent surfaces, the school design aims to inspire students, faculty, and staff in the discovery process, while also providing practical, hands-on education. In addition to general classrooms, faculty and staff offices and common areas, the building includes an aircraft hangar, a flight simulation room, culinary classrooms, and robotics laboratories.

 For more information, visit www.coopercarry.com/projects/clayton-county-college-career-academy.

Featured

  • Campus Safety Requires Using Every Resource Available

    Across the U.S., school and campus leaders are facing a security landscape that has changed dramatically over the past decade. Incidents on school property have increased in recent years, with several consecutive years setting record totals. According to analysis of data by CNN, dozens of shootings now occur on school grounds annually across K-12 and higher education environments.

  • Embry-Riddle Completes Construction on Research, Lab Facility

    Embry-Riddle Aeronautical University (ERAU) in Daytona Beach, Fla., recently announced the end of construction on a new research and lab facility on campus. The Center for Aerospace Engineering II (CAT II) will support aerospace research and technology development and broke ground last summer.

  • Deferred Maintenance Issues Growing at Universities, Gordian Reports

    U.S. colleges and universities are falling increasingly behind on facilities maintenance and repair, according to Gordian’s 13th annual State of Facilities in Higher Education report. The deferred capital renewal burden has reached $156 per gross square foot, an 8% increase over the previous year.

  • Minnesota District Opens New PreK–12 School

    Gibbon-Fairfax-Winthrop Schools in Gibbon, Minn., recently announced that construction is complete on a new, $68.9-million school for students in grades PreK–12, according to a news release.