Clayton County College & Career Academy

To help high school students explore career and higher education opportunities, Clayton County Public Schools (CCPS) is establishing a College and Career Academy in Morrow, a suburb south of Atlanta, Georgia. Phase 1 of the academy prepares students for careers and training in aviation mechanics/avionics, artificial intelligence (including drones and robots), distribution and logistics and culinary arts pathways. Cooper Carry is providing design services to demolish a portion of the existing Morrow High School and provide an addition that will support CCPS in realizing its vision for the academy.

Going beyond a standard high school design, the new facility design takes its cue from the airfoil – the cross-sectional shape of an airplane’s wing. The two-wing form incorporates a central courtyard that is just as significant to the campus as the building’s interior spaces. With clean sweeping lines, aerodynamic detailing and a play on opaque and transparent surfaces, the school design aims to inspire students, faculty, and staff in the discovery process, while also providing practical, hands-on education. In addition to general classrooms, faculty and staff offices and common areas, the building includes an aircraft hangar, a flight simulation room, culinary classrooms, and robotics laboratories.

 For more information, visit www.coopercarry.com/projects/clayton-county-college-career-academy.

Featured

  • Opportunity by Design Framework

    Opportunity by Design

    Educational improvement efforts often focus on curriculum, instruction, assessment, professional development, and intervention systems while treating the physical school building as background. But school design is not a passive backdrop to learning — it is a structural lever for equity.

  • Secret to Efficient, On-Time School Infrastructure & Modernization Projects is All in the Preparation

    Warmer weather and longer days make summer the ideal time for construction and modernization projects at educational facilities. School boards and construction firms must coordinate effectively to ensure that these projects do not extend even a single day into the school year and impede classroom operation.

  • Higher Ed is Betting on New Buildings While Quietly Undermining Their Campuses — Here’s Why

    In this climate, the owner’s representative has changed from a delivery-focused advisor to a strategic campus partner. Institutions are increasingly relying on owner’s reps not just to manage, cope, schedule, and budget, but also help evaluate whether a project should proceed at all.

  • Missouri Child Development Center Completes $2.3M Expansion

    The Urban Sprouts Child Development Center in St. Louis, Mo., recently announced the completion of a $2.3-million expansion and adaptive reuse project, according to a news release. The new space includes a retail café, outdoor learning space, and a support office building.