7 C Strategy for Cost-Effective Preventative Maintenance

Preventative maintenance is crucial for identifying maintenance needs and determining the amount of deferred maintenance needed. It will also help facility managers plan and prioritize projects and evaluate their costs.

“Cost-effective,” “preventative,” and “maintenance” are all common buzzwords used in the construction industry, and while the terminology is understood, few really understand how to make “cost-effective preventative maintenance” a reality for their facility.

Preventative maintenance activities are primarily condition-based. Cost-effective preventative maintenance is a fluid process that can have a huge impact on a property’s bottom line… if done properly. Created by Western Specialty Contractors, this “7 C Strategy for Cost-Effective Preventative Maintenance” list will help building owners and facility managers understand and put into practice a cost-effective preventative maintenance plan of their own.

Components and Conditions

A preventative maintenance program begins with making a list of a facility’s different components and gathering basic information on each of their conditions. Collecting this information is crucial for identifying maintenance needs and determining the amount of deferred maintenance needed. It will also help facility managers plan and prioritize projects and evaluate their costs. Tips for compiling the list include:

  • Keep an accurate building component inventory
  • Make a plan for performing a condition assessment
  • Conduct the assessment methodically
  • Assign condition ratings for each component
  • Decide on a regular frequency for assessments

Capacity and Costs

Preventative maintenance isn’t about big budgets or how much money is spent. To be cost-effective, it’s all about how the money is spent. Facility managers are encouraged to make a plan that targets their resources towards the highest needs.

To make a great plan, facility managers need to develop the capacity for ranking maintenance projects and evaluating their costs by doing the following:

  • Recognize that not all projects share the same importance
  • Use an objective process for prioritizing projects
  • Use life-cycle costing and other tools to evaluate total costs

Coordinate

When facility managers don’t have a plan, maintenance tends to be reactive instead of proactive. In other words, maintenance only happens when the need occurs, which typically results in higher repair costs and inconvenience. Coordinating long- and short-term maintenance plans together will help facility managers avoid costly reactive maintenance. Coordination includes:
  • Develop a long-term plan
  • Develop a capital improvement program
  • Establish a reserve account for maintenance
  • Develop an annual work plan
  • Link the annual work plan with the annual budget

Checklists

Once an assessment and inventory of all components have been made, the projects have been prioritized, and their costs have been evaluated, now is the time to make checklists and mini-frameworks for staff to execute the maintenance plan. Start by doing the following:

  • Develop checklists of tasks
  • Determine the frequency for tasks
  • Link preventative maintenance with everyday tasks
  • Schedule a timeline
  • Prepare procedures for managing the program

Contractors

No matter what the quality, performance characteristics, and cost of a material or system, each of these is only as effective as the caliber of its installation. Even the best systems may prove worthless or ineffective if not installed and transitioned properly. Improper installation can lead to structural and interior damage that could result in lost revenue for the building owner.

A critical aspect is contractors. It’s not about finding the one with the cheapest estimate; it’s about finding the right contractor for the project. The right contractor will make any project a lot less stressful. When selecting a contractor, consider the following:

  • Make a thorough review of whether they have the right experience and skills for the project
  • Determine whether they have proper fiscal responsibility to complete the project and honor the punch list
  • Create a qualification statement to pre-qualify contractors for projects

With these 7 Cs in place, the practice of preventative maintenance will offer your campus many important benefits, the most important of which is that it can improve your bottom line.

About the Author

Western Specialty Contractors (www.westernspecialtycontractors.com), based in St. Louis, MO, is the nation's largest specialty contractor in masonry and concrete restoration, waterproofing, and specialty roofing.

Featured

  • All Surfaces Announces New Director of Commercial Business Development

    Surface solutions provider All Surfaces recently announced that it has hired a new Director of Commercial Business Development in Torie Bonafede. Bonafede will work to build the company’s market presence in various categories and drive strategic initiatives to expand its commercial sales portfolio.

  • KI Joins Education Design Research Consortium as Founding Sponsor

    Furniture solutions manufacturer KI recently announced alongside the Center for Advanced Design Research and Evaluation (CADRE) that it will become a founding sponsor for the Coalition for the Advanced Understanding of School Environments (CAUSE). A news release reports that the coalition’s research will focus on the relationship between K–12 physical environments and educational outcomes.

  • DLR Group Appoints New Senior Design Researcher

    Integrated design firm DLR Group recently announced that it has appointed Dr. Kati Peditto, Ph.D., EDAC, as the new senior design researcher for its research team, according to a news release. Peditto is a design psychologist who specializes in inclusive design and neurodiversity, joining the firm’s office in Denver, Colo.

  • Adelphi University Launches $100M Fundraising Campaign

    Adelphi University in Garden City, N.Y., recently launched The Momentum Campaign: Extraordinary Impact, a $100-million fundraising initiative, at a gala on campus, according to a news release. The campaign is set to last through 2027 and fund six strategic priorities to improve success on campus.

Digital Edition