CA District Deploying Solar at 8 Sites

Orange Unified School District has begun construction on its first solar project. The installation will include a combination of ground-mounted and shade canopies at eight district sites, generating a projected 3.6 million kilowatts of renewable electricity during the first year of operation. The school system, which has 28,000 students, is working with Ameresco on the project.

The district said the use of solar would reduce carbon emissions by 2,512 metric tons, the annual equivalent of taking 533 cars off the road for a year.

"Transitioning to renewable energy sources such as solar is a cornerstone of this district’s long-term sustainability plan," said OUSD Energy Manager, Andrew Durrett, in a statement.

Under the terms of the agreement, Ameresco will pay all costs, including the design, construction, operation, and ongoing maintenance of the solar panels. Under these kinds of deals, often, the solar project is installed under a long-term "net metering" structure. The district will purchase solar power generated through the installation from Ameresco and sell it to the local utility; in return the district will receive credits that are applied to its utility bills. Because electricity is worth more when it is used to offset a retail bill than when it is sold into the commodity wholesale market, the approach is projected to provide greater savings than having the district buy the electricity from Ameresco and use it directly in its buildings.

"In today’s dollars, the anticipated savings in utility costs to be realized by this agreement is projected at $5.3 million, which has been confirmed by an independent third-party energy specialist," said Assistant Superintendent of Business Services, David Rivera. Money generated through solar savings will be folded into the district's reserves.

About the Author

Dian Schaffhauser is a former senior contributing editor for 1105 Media's education publications THE Journal, Campus Technology and Spaces4Learning.

Featured

  • Building Beyond Simulation: Creating Immersive Ecosystems for Healthcare Education

    Health sciences education is one of the fastest-growing facility types in colleges and universities. The demand for medical, nursing, and allied health professionals is driving the creation and renovation of medical simulation training facilities that provide students with real-world experience through advanced simulation-based learning.

  • Back-to-School Playground Safety: 7 Common Hazards to Look for After Summer Break

    As summer break comes to an end, school administrators have plenty to prepare before students return. While classrooms, hallways and common areas often receive attention during all the back-to-school preparations, the playground should not be overlooked. Months of weather exposure, storms, and regular wear can leave behind hazards that may not be immediately noticeable.

  • Montclair State University Starts Construction on $120M STEM Building

    Montclair State University in Montclair, N.J., recently broke ground on a new $120-million Interdisciplinary Science Building, according to university news. The university partnered with HoK Architects for the project’s design, and it’s scheduled to open in time for the 2028–29 academic year.

  • DLR Group Hires Three for Higher Education Practice

    Integrated design firm DLR Group recently announced that it has brought three new hires on board to help shape its higher education practice in California and the northeast, according to a press release.