Net-Zero Middle School to Be Built Outside of Houston

A new middle school, just outside of Houston, will have a net zero design, meaning the building will produce as much energy as it consumes. Corgan, the architecture firm that designed the school, presented the latest schematics at a Fort Bend ISD school board meeting on Sept. 16.

The new middle school located in Missouri City will include about 90,000 square feet of solar panels on the roof and overhangs.

The new middle school located in Missouri City will include about 90,000 square feet of solar panels on the roof and overhangs. The energy produced by the solar panels will be converted on-site and sent to the power company who will give the school credit for the power it produces, reported Community Impact Newspaper.  

“We are going to achieve net zero by using renewable energy resources and an enhanced building envelope that will reduce the heating and cooling load on this building,” said AJ Sustaita, an education architecture project manager at Corgan.

The 2018 FBISD bond election included funds for the new middle school. The school district approved Corgan to prepare design and construction documents for the school in December. The proposed project budget is more than $10 million.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • Spaces4Learning Announces Winners of 2025 Product Awards

    Spaces4Learning has just announced the winners of the 2025 Product Awards! The award program recognizes innovation and excellence in products that enhance learning environments in K–12 schools and institutions of higher education.

  • Missouri State University Debuts Construction Education Center

    Missouri State University in Springfield, Mo., recently opened a new 10,000-square-foot addition and renovation to support the School of Construction, Design, and Project Management, according to university news. The Construction Education Success Center, built onto the existing Kemper Hall, provides academic space for the school’s construction managers and cost $9.6 million.

  • classroom with crystal ball on top of a desk

    Call for Opinions: Spaces4Learning 2026 Predictions for Educational Facilities

    As 2025 winds to a close, the Spaces4Learning staff is asking its readers—school administrators, architects, engineers, facilities managers, builders, superintendents, designers, vendors, and more—to send us their predictions for educational facilities in 2026.

  • Pudu Robotics Launches AI-Powered, Large-Scale Floor Sweeper

    Pudu Robotics recently launched the newest member of its MT1 series of robotic floor sweepers, the PUDU MT1 Max, according to a news release. The AI-powered, 3D perception robotic sweeper was designed for use in large, complex cleaning environments both indoors and semi-outdoors, like parking garages and semi-open building atriums.

Digital Edition