Kenyon College Building New Library

GAMBIER, OH – September 10 marked an occasion to celebrate in the construction of the new library at Kenyon College, designed by GUND Partnership. The entire campus community and design and construction teams were invited to sign a structural steel beam painted Kenyon’s signature purple. The beam signing was followed with a ceremony to mark the topping off of the library. Kenyon President Sean Decatur officiated the ceremony and unveiled the building’s new name, a name that is borrowed from the past: Chalmers Library. After the name was announced, spectators watched as Smoot Construction hoisted the purple beam to the top of the new library. Construction will be complete by the end of 2020, with an opening planned for spring 2021.

Kenyon College Library 500

Chalmers Library replaces Kenyon’s existing Olin and Chalmers libraries, which were not optimized for 21st-century learning and were at their physical limits. The new library is expecting LEED Gold certification and presents one of the largest opportunities to reduce Kenyon’s carbon footprint through signification energy savings. The new highly flexible state-of-the-art library will support active and collaborative learning and will feature a variety of environments to encourage student growth, curiosity, and exploration. Academic Advising, Career Development, the Registrar, and Student Accessibility Services will move to the library as an integrated hub connecting work inside the classroom with work outside of it.

The original Chalmers Memorial Library opened in 1962 and was named for Gordon Keith Chalmers, Kenyon’s 13th president, who served from 1937 until his death in 1956. The new Chalmers library will also recognize his wife, Roberta Teale Swartz Chalmers H’60, a poet, teacher, and co-founder of the Kenyon Review.

Featured

  • Thomas F. Frist, Jr. College of Medicine

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Thomas F. Frist, Jr. College of Medicine has been recognized with an EDS 2025 Project of Distinction award in the category of New Construction.

  • The Role of Unified Communications in Hyflex Education

    Academic technology and pedagogy have evolved in ways few could have imagined a decade ago. Today, hybrid/flexible (or hyflex) learning environments — a mix of in-person and remote instruction — are the new normal. However, as promising as it sounds, making hyflex work smoothly is no small feat.

  • California Middle School Completes Two New Academic Buildings

    Sunnyvale Middle School in Sunnyvale, Calif., recently announced that construction is complete on two new classroom buildings of two stories each, according to a district news release. The new wing will house seventh- and eighth-grade students and is part of a larger campus modernization project.

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

Digital Edition