MiraCosta College Celebrates Community Learning Center Groundbreaking

OCEANSIDE, CA – MiraCosta Community College District (MCCD) has announced the start of construction of the new Student Services Building at the District’s Community Learning Center Campus in Oceanside.

The new 9,910-square-foot Student Services Building will provide a student-centered facility that consolidates the study areas and socialization spaces, along with staff space, into a single, dynamic environment. The new building will provide an anchor for the new campus quad that will encourage students to interact with the outdoor environments. The design will correct previous space deficiencies in office, library and instructional media spaces.

Miracosta College Student Services Building

The $12.3 million project will include an events terrace, a park and native garden, and a series of bioswales — shallow, open, and typically vegetated channels with gently sloping sides that can be incorporated into landscapes to direct and slow storm runoff and promote pollutant removal.

A ceremonial groundbreaking for the project is scheduled for February 13.

The project architect is Lord Architecture; Align Builders was awarded the contract for construction last month by the MCCD Board of Trustees. Other project team members include Consulting & Inspection Services as the inspector of record; Kitchell for program and construction management; MTGL, Inc. for material testing and special inspection; and RMA Group for geotechnical services.

Featured

  • University of Pennsylvania Releases Design of Future Physical Sciences Building

    The University of Pennsylvania (Penn) in Philadelphia, Penn., recently released renderings of an upcoming 350,000-square-foot Physical Sciences Building, according to news release. The facility was designed by CO Architects and will unite the university’s departments of Physics and Astronomy, Mathematics, and Earth and Environmental Science.

  • Opportunity by Design Framework

    Opportunity by Design

    Educational improvement efforts often focus on curriculum, instruction, assessment, professional development, and intervention systems while treating the physical school building as background. But school design is not a passive backdrop to learning — it is a structural lever for equity.

  • Minnesota District Opens New PreK–12 School

    Gibbon-Fairfax-Winthrop Schools in Gibbon, Minn., recently announced that construction is complete on a new, $68.9-million school for students in grades PreK–12, according to a news release.

  • Wyoming District Breaks Ground on New Elementary School

    Laramie County School District #1 in Cheyenne, Wy., recently held a groundbreaking ceremony for the upcoming Mountain View Elementary School, according to a news release. The facility has an estimated completion date of summer 2028, and it will have the capacity for 650 students in fifth and sixth grade.