Wisconsin HS Renovation Features Wire Mesh Infill Panels

Superior High School in Superior, Wisconsin recently completed a $60-million renovation and expansion project which includes classrooms, offices, common area, gymnasium, library media center, and cafeteria space. LHB provided architecture and engineering services and Kraus-Anderson Construction provided construction management services.

The 333,606-square-foot high school includes the addition of railing infill panels made by Banker Wire, a manufacturer of woven and welded wire mesh for architectural and industrial applications.

The 333,606-square-foot high school includes the addition of railing infill panels made by Banker Wire, a manufacturer of woven and welded wire mesh for architectural and industrial applications. The three-story facility specifically utilizes Banker Wire’s M13Z-7 framed in Banker’s Versatile Spine.

The 333,606-square-foot high school includes the addition of railing infill panels made by Banker Wire, a manufacturer of woven and welded wire mesh for architectural and industrial applications.

M13Z-7 is “a rigid cable and intercrimp hybrid wire mesh pattern that maximizes the percent open area by using a set of three intercrimp fill wires.” This provides a durable railing infill panel that offers safety and security while also giving greater visibility between the large stair landings which look down to the common spaces.

The 333,606-square-foot high school includes the addition of railing infill panels made by Banker Wire, a manufacturer of woven and welded wire mesh for architectural and industrial applications.

“LHB selected M13Z-7 to be utilized as an architectural feature material on the grand stairway at Superior High School,” said Anne Porter, Interior Design Project Manager, LHB. “Banker Wire’s M13Z-7 was framed with the company’s Versatile Spine to provide a finished element. These decorative panels were then mounted to the railing structure to provide an industrial aesthetic while also achieving code requirements. Banker Wire was selected due to its product’s durability that required no added finishing and was prefabricated off site.”

Both M13Z-7 wire mesh and Verstile Spine framing were manufactured in stainless steel.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • Rhode Island Boarding School Completes Student Dorm Renovations

    St. George’s School in Middletown, R.I., recently announced the completion of a $26-million renovation project on Arden-Diman-Eccles Dormitory, according to a news release. The school partnered with Voith & Mactavish Architects (VMA) on the new space, which places a new focus on collaborative community spaces open to both boarding students and day students.

  • UT System Board of Regents Approves $108M Housing Complex

    The University of Texas System Board of Regents recently announced the approval of a new, $108-million housing complex at the University of Texas at El Paso (UTEP), according to a news release. The facility will stand four stories and have a total of 456 new beds for freshmen students.

  • LSU Breaks Ground on $200M Residential Project

    Louisiana State University in Baton Rouge, La., recently broke ground on a new residential complex, according to university news. The South Quad residential project will consist of two buildings and add a total of 1,266 beds for freshmen students. The development comes with a price tag of $200 million, and it’s scheduled to open to students in fall 2027.

  • Houston K–12 District Opens New Elementary School

    The Lamar Consolidated Independent School District (Lamar CISD) recently announced the completion of a new elementary school in a western suburb of Houston, Texas, according to a news release. Haygood Elementary School measures in at 110,000 square feet, has the capacity for 854 students, and is the first of three new schools scheduled to be built in the Cross Creek West community.