Dallas ISD Considering In-Person, Virtual, Hybrid Instruction Options

School districts across Texas are waiting on key decisions on school funding and COVID-19 guidelines from the Texas Education Agency before making final decisions on reopening schools, reports The Dallas Morning News.

Dallas ISD is waiting on direction from the state and haven’t solidified plans, yet. In the meantime, the district has created a first draft of safety and security guidelines for campus reentry, along with three different potential instructional models.

Some of the safety and security guidelines Dallas ISD will implement when in-person classes resume:

  • The district will provide each student with three reusable masks and will require students to wear them on the bus or building. Students will wear face shields in classrooms.
  • Plexiglass will be used to create dividers for cafeteria tables, as well as desks. This allows them to be placed closer than six feet while still providing barriers of protection.
  • Temperature checks will be required when boarding the bus or arriving to campus.
  • Portable hand sanitizer stations will be placed outside each classroom.
  • The district will also be changing dismissal patterns and creating one-way paths in hallways.

The district is considering three different instruction models that include: in-person instruction in schools starting on Aug. 17; remote learning; or a hybrid model between the two.

There are three hybrid model options to choose from, which include:

  • Half of students, probably divided by grade level, would attend in-person classes on Monday and Tuesdays, while the other half goes on Wednesdays and Thursdays. Students would work remotely when not on campus.
  • Elementary students would use secondary campuses to spread out and utilize more space while secondary students work 100% remotely.   
  • Parents would decide whether they want students to work at home or remotely.

Students working remotely would have access to one-to-one devices and internet hotspots if they needed them. Online instruction would be regularly scheduled periods with teachers.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • Minnesota Middle School Finishes $23.5M Addition and Modernization

    Highland Park Middle School in St. Paul, Minn., recently announced the completion of a $23.5-million addition and remodel project, according to a news release. Saint Paul Public Schools partnered with ATS&R Planners, Architects & Engineers for its design and Kraus-Anderson for its construction.

  • University of Kansas Opens $400M Football Stadium Reconstruction

    The University of Kansas in Lawrence, Kan., recently announced that the $400-million reconstruction of David Booth Kansas Memorial Stadium is complete in time for the 2025 football season, according to a news release. The university partnered with Turner Construction Company on the project.

  • Armstrong World Industries Acquires Geometrik

    Armstrong World Industries, designer and manufacturer of interior and exterior architectural applications like ceilings, walls, and metal solutions, recently announced its acquisition of Canada-based Geometrik, according to a news release. The British Columbian Geometrik specializes in designing and manufacturing wood acoustical and wall systems.

  • classroom with crystal ball on top of a desk

    Call for Opinions: Spaces4Learning 2026 Predictions for Educational Facilities

    As 2025 winds to a close, the Spaces4Learning staff is asking its readers—school administrators, architects, engineers, facilities managers, builders, superintendents, designers, vendors, and more—to send us their predictions for educational facilities in 2026.

Digital Edition