Five Tips for Creating a Vibrant, Modern Learning Space

When we merged two elementary schools to form the new West Rowan Elementary School building last year, we knew we had our work cut out for us. Fortunately, both schools already embraced alternative classroom seating arrangements. With that buy-in on our side, we replaced the traditional “one-size-fits-all” classroom seating approach with one that allowed students to pick a place to sit, lounge on a comfortable plush couch, or even lie on the floor.

Classroom with flexible furniture at West Rowan Elementary School.

Knowing that kids perform best when they’re comfortable, we hired MiEN Company to help us bring our vision to reality. Here are five strategies we used to make it happen:

1. Form a teacher-centric planning committee. We mobilized a team of teachers to serve on a “furniture committee.” The committee then met with the school system representatives and was ultimately part of the decision to work with MiEN as our furniture partner.

2. Find a reliable, experienced vendor. The company gave us some preliminary ideas and let us look at a variety of different furniture options. They listened and took notes as we were thinking out loud, and then came back with great ideas that fit our vision. Using those ideas, our committee came back with a variety of different seating, table, and desk arrangements that teachers were able to choose from.

3. Give teachers a few great choices to select from. We knew that making teachers choose from dozens of furniture styles and colors would be completely overwhelming, so we narrowed it down to a couple of options for K-2 and a couple more for grades 3-5. Teachers picked from Room A or Room B designs, but were also able to customize their rooms according to their own preferences.

4. Promote collaboration during the selection process. Much like our classrooms are now highly collaborative, engaging environments, the furniture selection process was equally as collaborative from the teacher/committee perspective. It was exciting to see instructors team up to create innovative learning spaces that would come together to create one cohesive campus experience.

5. Help teachers through the paradigm shift. Change isn’t always easy to manage and some of our teachers were initially uncomfortable with their new classroom setups. They just couldn’t get past the fact that you really don’t need a specific chair for every child. It was a paradigm shift for some of them. To help, we talked to teachers about the value of having a more modular, flexible classroom, and encouraged them to weave that into their instructional planning. We wanted to ensure that we put students first in all that we do.

Throughout the entire building process, we continually reassured teachers and encouraged them to think about their teaching as they were planning out their spaces. We wanted them to make decisions in the best interest of their students, knowing that the “one-size-fits-all” classroom furniture model just doesn’t work in the modern learning environment. 

About the Author

Kristine Wolfe is Principal at West Rowan Elementary School in Cleveland, N.C.

Featured

  • textured paper collage shows a school building on fire as a fire truck sprays water into the flames

    Why a Fire Loss Is More than Flames

    We've all seen what fire damage can do to a property, but the types of damage building owners often encounter after a fire loss can exceed expectations. Having full awareness of the different forms of damage properties can sustain helps owners respond faster, reduce continued damage, and get back on the road to recovery in short order.

  • DLR Group Appoints New K–12 Education Practice Leader

    Integrated design firm DLR Group recently announced that it has named its new global K–12 Education leader, Senior Principal Carmen Wyckoff, AIA, LEED AP, according to a news release. Her teams have members in all 36 of the firm’s offices in the U.S., Puerto Rico, the U.S. Virgin Islands, Europe, and Asia.

  • Construction Begins on East Austin CTE-Focused High School

    The Del Valle Independent School District recently announced that construction has begun on a new CTE-focused high school in Austin, Texas, according to a news release. Del Valle High School will measure in at 473,338 square feet and have the capacity for 2,400 students.

  • Texas State University Completes Stadium Renovations

    Texas State University in San Marcos, Texas, recently announced that it has completed a series of additions and renovations to its football stadium, according to a news release. Formerly known as the Bobcat Stadium End Zone Complex, the Johnny and Nathali Weisman Football Performance Center is an 85,000-square-foot expansion featuring hospitality spaces, banquet spaces, exterior concourses, and upgrades to the field house.

Digital Edition