Construction Nears Completion on Drone Lab at St. Mary's University in TX

St. Mary’s University in San Antonio, TX is nearing completion of new drone lab, which is on target to be done in October. The $600,000 Unmanned Aerial Systems (UAS) Lab is being built by the School of Science, Engineering and Technology.

<p>3D rendering of the Unmanned Aerial Systems Laboratory. Source: <a href="https://www.stmarytx.edu/">St. Mary's University</a></p>

The 1,734-square foot lab has a 25-foot ceiling and includes a flight area, an observation area and workstations. The expectation is that faculty will be able to include drones in their instruction and students will be able to participate in drone-related research for industry partners.

"This is an opportunity to add programming that will launch St. Mary’s graduates into a fast-growing emergent industry," said Winston Erevelles, dean of the School, in a press release. Erevelles said that the Federal Aviation Administration predicted that the U.S. registered commercial drone fleet would climb to between 442,000 and 1.6 million units in the next few years, "which will in turn create a few hundred thousand jobs."

According to Erevelles, the facility will serve as a multi-purpose operation, supporting a new UAS concentration under the B.S. in Engineering Science program that launched this fall and housing summer camps for high school students.

"Drone technology has been around for more than 50 years. However, it was exclusively used by the military and was not available to the private sector until recently," added Bahman Rezaie, a professor of electrical engineering, who has been an early proponent of drone research at the university. "The more drones become part of everyday business in all aspects of life, the more need for a workforce that is knowledgeable and capable of maintaining and designing a variety of drones."

Funding came from a $3 million Title V – Building Capacity for Excellence in STEM Education grant as well as support from the Albert & Margaret Alkek Foundation and the Union Pacific Foundation.

About the Author

Dian Schaffhauser is a former senior contributing editor for 1105 Media's education publications THE Journal, Campus Technology and Spaces4Learning.

Featured

  • Phoenix High School Completes First Phase of Campus Renovations

    Metro Tech High School, part of the Phoenix Union High School District (PXU) in Phoenix, Ariz., recently announced the completion of the first stage of a campus renovation project, according to a news release. The school reopened a series of public-facing business operations spaces including credit union, daycare, floral, cosmetology, and culinary services. It also includes new CTE learning spaces for the school’s nursing assistant, pharmacy, and sports medicine programs.

  • Auburn University Debuts $224M STEM + Agricultural Sciences Complex

    Auburn University in Auburn, Ala., recently opened its new $224-million STEM + Agricultural Sciences Complex, the largest research construction project in the university’s history, according to university news. The facility measures more than 265,000 square feet and brings six departments from the College of Agriculture and College of Sciences and Mathematics together under one roof.

  • Charles R. Drew University Opens Health Professions Education Building

    Charles R. Drew University of Medicine and Science (CDU) has officially opened its new Health Professions Education Building (HPEB) in South Los Angeles.

  • Nashville Elementary School Receives LEED Gold Certification

    Goodlettsville Elementary School, part of Metro Nashville Public Schools in Nashville, Tenn., recently achieved LEED Gold Certification from the U.S. Green Building Council (USGBC), according to a news release. The 81,750-square-foot school opened in 2023 and was designed by Goodwyn Mills Cawood (GMC).