Construction Nears Completion on Drone Lab at St. Mary's University in TX

St. Mary’s University in San Antonio, TX is nearing completion of new drone lab, which is on target to be done in October. The $600,000 Unmanned Aerial Systems (UAS) Lab is being built by the School of Science, Engineering and Technology.

<p>3D rendering of the Unmanned Aerial Systems Laboratory. Source: <a href="https://www.stmarytx.edu/">St. Mary's University</a></p>

The 1,734-square foot lab has a 25-foot ceiling and includes a flight area, an observation area and workstations. The expectation is that faculty will be able to include drones in their instruction and students will be able to participate in drone-related research for industry partners.

"This is an opportunity to add programming that will launch St. Mary’s graduates into a fast-growing emergent industry," said Winston Erevelles, dean of the School, in a press release. Erevelles said that the Federal Aviation Administration predicted that the U.S. registered commercial drone fleet would climb to between 442,000 and 1.6 million units in the next few years, "which will in turn create a few hundred thousand jobs."

According to Erevelles, the facility will serve as a multi-purpose operation, supporting a new UAS concentration under the B.S. in Engineering Science program that launched this fall and housing summer camps for high school students.

"Drone technology has been around for more than 50 years. However, it was exclusively used by the military and was not available to the private sector until recently," added Bahman Rezaie, a professor of electrical engineering, who has been an early proponent of drone research at the university. "The more drones become part of everyday business in all aspects of life, the more need for a workforce that is knowledgeable and capable of maintaining and designing a variety of drones."

Funding came from a $3 million Title V – Building Capacity for Excellence in STEM Education grant as well as support from the Albert & Margaret Alkek Foundation and the Union Pacific Foundation.

About the Author

Dian Schaffhauser is a former senior contributing editor for 1105 Media's education publications THE Journal, Campus Technology and Spaces4Learning.

Featured

  • URI Cuts Underwater Ribbon on New Ocean Robotics Laboratory

    The University of Rhode Island recently held a ribbon-cutting ceremony for a new Ocean Robotics Laboratory at its Narragansett Bay Campus, according to a news release. Two students used a remotely operated vehicle to cut an underwater ribbon in a 30-by-20-foot test tank.

  • UT-San Antonio Begins Residence Hall Renovations

    The University of Texas at San Antonio recently began a $6-million renovation project to one of its residence halls, according to a news release. Originally completed in 1986, Chisolm Hall measures in at 120,860 square feet and is the oldest and largest residence hall on campus.

  • Wyoming District Breaks Ground on New Elementary School

    Laramie County School District #1 in Cheyenne, Wy., recently held a groundbreaking ceremony for the upcoming Mountain View Elementary School, according to a news release. The facility has an estimated completion date of summer 2028, and it will have the capacity for 650 students in fifth and sixth grade.

  • Missouri K–12 District Cuts Ribbons on Two New Middle Schools

    Springfield Public Schools in Springfield, Mo., recently celebrated the completion of two new middle school facilities with ribbon-cutting ceremonies, according to a district news release. The district officially opened the new Pipkin Middle School and Reed Academy on Sept. 3, both of which were funded through the $220-million Proposition S bond program approved by voters in 2023.