Oakwood Schools to Receive New HVAC System

One of the only remaining components of the $18 million Oakwood City Schools renovation project in Dayton, Ohio, is the installation of a brand-new HVAC system for the high school/junior high building. Currently, about half of the 97-year-old building is running on a new system, and the other half still uses an outdated, steam-heated network, according to school district Operations Coordinator Todd Scott.

Scott said that renovations to the remaining half “will not start until we get safely through winter, when we won’t need them any more for the rest of the year and we can finish off tying all of the HVAC together once all of the rooms are done.”

The construction project, which has been in the works since 2019, is on budget and slated to be finished by August. The goal is to improve the infrastructure of buildings with an average age of more than 90 years old. Other upgrades include replacing roofing, adding new boilers, and bathroom renovations.

The school’s ventilation system is being reworked with the COVID-19 pandemic in mind. The variable refrigerant flow (VRF) system will provide better quality and higher-efficiency heat, and the distribution will allow the flow to mix with outside fresh air “to make sure we’re getting enough fresh air in the building for kids and staff,” said Scott.

Renovations in 2004 updated the heating and cooling systems in part of the building. During this next part of construction, the VRF system will be retrofitted into the rest of it.

The district is partnering on the project with Danis Construction, which has already almost completed work at two other schools. In addition to the HVAC system, remaining renovations to be finished at the high school/junior high building include ceiling replacements with new LED lights, environmental abatement, remodeling bathrooms, and installing a new electric transformer.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Illinois District Boosts Security at High-School Stadium

    Richmond-Burton Community High School in Richmond, Ill., recently announced that it has completed the redesigned entrance to its high school stadium with a new focus on school security and community engagement, according to a news release. The district partnered with Wold Architects and Engineers on the project as part of District #157’s year-long facilities master plan.

  • Beyond Four Walls

    Operable glass walls provide a dynamic solution for educational spaces. They align with today’s evolving teaching methods and adapt to the needs of modern learners. Beyond the functional versatility, movable glass walls offer clean, contemporary aesthetics, slim and unobtrusive profiles, and versatile configurations that cater to the evolving needs of students and educators alike.

  • North Carolina District Completes New Elementary School

    The Wake County Public School System (WCPSS) in Holly Springs, N.C., recently announced that construction on a new elementary school has finished, according to a news release. Rex Road Elementary School measures in at 133,000 square feet and is the fifteenth school that general contractor Balfour Beatty has completed for the district.

  • California K–12 District Opens New Athletic Complex, Gym

    The San Mateo Union High School District (SMUHSD) in San Mateo, Calif., recently announced the completion of two new athletics facilities: a new gymnasium at Burlingame High School, and a new athletic training complex at San Mateo High School, according to a news release.

Digital Edition