Michigan Regional Theater to Renovate Historic School Building

The Encore Theatre Company, a nonprofit theater group in Dexter, Mich., is raising money to renovate its new performance space—a historic school building downtown.

The theater group purchased the old school house, known as the Copeland building, from Dexter Community Schools last year for a price of $1 million. Now, it is seeking to fundraise about that same amount to convert the space into a modern performance venue.

“Our new building is evolving into a state-of-the-art theater center, where the finest talent of southeast Michigan, Broadway, and other top industry professionals will come together to produce and develop extraordinary shows,” said Daniel Cooney, the group’s co-founder and artistic director. “This is also an opportunity to breathe new life into a historic building, and to provide musical theater training to the next generation of artists in our region.”

The Copeland building was built in 1857 as the Dexter Union Schoolhouse. It was rebuilt in 1887 and saw major renovations in 1936. Already featuring a rather sizable auditorium, the final renovations will convert the 20,000-square-foot building to include public meeting spaces, classrooms for arts education programs, a lobby, a café, and a bar.

Encore has already received $500,000 from the Bernard L. Maas Foundation, as well as significant contributions from its patrons. It’s currently in the process of raising an additional $1.3 million, which it hopes to have by the end of 2021, in a capital campaign called “OUR NEXT STAGE.” It’s soliciting from local individuals, organizations, and businesses for tax-deductible donations. The group also notes that “naming rights for the building, lobby, entrance, café and bar, as well as other areas within the facility” are still up for grabs.

“This renovation will create an expanded, public arts destination in downtown Dexter, attracting tens of thousands to local businesses and the surrounding community annually through professional musical theater productions and an active arts education program for youth of all ages,” said the Encore Theatre Company in a statement.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Photo courtesy of Kraus-Anderson

    Concordia College Completes Memorial Auditorium Renovations

    Concordia College in Moorhead, Minn., recently completed a $2.5-million renovation project to Memorial Auditorium, a news release reports. The college partnered with Kraus-Anderson for the project’s construction and ICON Architectural Group for its design.

  • Virginia Tech Tops Out New College of Engineering Building

    Virginia Tech in Blacksburg, Va., recently celebrated the topping out of Mitchell Hall, which will soon stand as the largest College of Engineering building on campus, according to a news release. The university partnered with Skanska on the 285,500-square-foot facility, which has an expected completion date of winter 2028.

  • Montclair State University Starts Construction on $120M STEM Building

    Montclair State University in Montclair, N.J., recently broke ground on a new $120-million Interdisciplinary Science Building, according to university news. The university partnered with HoK Architects for the project’s design, and it’s scheduled to open in time for the 2028–29 academic year.

  • Back-to-School Playground Safety: 7 Common Hazards to Look for After Summer Break

    As summer break comes to an end, school administrators have plenty to prepare before students return. While classrooms, hallways and common areas often receive attention during all the back-to-school preparations, the playground should not be overlooked. Months of weather exposure, storms, and regular wear can leave behind hazards that may not be immediately noticeable.