Movo WebMic HD Pro Offers Multiple Solutions for Remote Learners

As many universities continue to default to remote learning during the pandemic, students have expressed frustration with the variety of technical difficulties they continue to face. From bad audio or video quality to disruptions in Internet service, more than 40% of remote students say they believe that connectivity problems are having a negative impact on their education.

The Movo WebMic HD Pro launched on Kickstarter on March 1 and reached its target goal of $15,000 by the next day. The product combines an HD web camera, a condenser microphone, and an LED ring light into one device for what a press release calls an “all-in-one” solution for video conferencing needs on any platform. The 1080p camera captures video at 30 fps, while the microphone filters out background noise and the ring light features three different levels of brightness. It also comes with a portable handheld or tabletop stand, an adjustable mount, and a built-in headphone jack.

“We’re excited to help teachers, students, streamers and content creators up their game with the Movo WebMic HD Pro,” said Movo CEO Ben Halbertstam. “We noticed the low-quality audio and video that people were experiencing while using their built-in or outdated webcams and microphones during the early stages of the COVID-19 pandemic and wanted to provide an all-in-one solution.”

The product comes in a few variations for specific needs. The Movo WebMic includes only a cardioid condenser microphone, while the WebMic HD features the microphone and HD webcam; the WebMic 4K features the microphone and a 4K camera; and the WebMic 4K Pro features the microphone, a 4K camera, and the LED ring light.

As of March 17, 2021, the Movo WebMic HD Pro’s Kickstarter page reports that the project has raised $392,298 against its goal of $15,000. All variations of the product are scheduled to begin shipping in August.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Photo courtesy of Kraus-Anderson

    Concordia College Completes Memorial Auditorium Renovations

    Concordia College in Moorhead, Minn., recently completed a $2.5-million renovation project to Memorial Auditorium, a news release reports. The college partnered with Kraus-Anderson for the project’s construction and ICON Architectural Group for its design.

  • Virginia Tech Tops Out New College of Engineering Building

    Virginia Tech in Blacksburg, Va., recently celebrated the topping out of Mitchell Hall, which will soon stand as the largest College of Engineering building on campus, according to a news release. The university partnered with Skanska on the 285,500-square-foot facility, which has an expected completion date of winter 2028.

  • Montclair State University Starts Construction on $120M STEM Building

    Montclair State University in Montclair, N.J., recently broke ground on a new $120-million Interdisciplinary Science Building, according to university news. The university partnered with HoK Architects for the project’s design, and it’s scheduled to open in time for the 2028–29 academic year.

  • Back-to-School Playground Safety: 7 Common Hazards to Look for After Summer Break

    As summer break comes to an end, school administrators have plenty to prepare before students return. While classrooms, hallways and common areas often receive attention during all the back-to-school preparations, the playground should not be overlooked. Months of weather exposure, storms, and regular wear can leave behind hazards that may not be immediately noticeable.