Mohawk Group Debuts Data Tide Carpet Collection

Commercial flooring solutions company Mohawk Group has announced the release of its Data Tide collection, a variety of modular carpet planks with a design evoking the visualization of water.

According to a news release, the collection “celebrates the unique ecosystem of estuaries where freshwater and saltwater converge to sequester Blue Carbon and support biodiversity.” Mohawk designers used the visualization of data sets from studies of greenhouse gases to create a series of planks celebrating the ecological influence of blue carbon, carbon stored in coastal and marine ecosystems.

“At Mohawk Group, we are committed to preserving our water ecosystems,” said Jackie Dettmar, vice president of commercial marketing and product development. “We strive to help customers create spaces that are environmentally responsible, and we’re expanding these efforts to encourage respect for rivers, waterways and the diversity of life they make possible.”

The 12-by-36-inch modular carpet planks come in eight colorways and feature color gradations flowing from light to dark that resemble transitioning waters. Flooring from the Data Tide collection can be placed with any other Mohawk Group soft or hard flooring solution, as well as paired with its finishing accessories.

Mohawk Group Data Tide Collection
Photo credit: Mohawk Group

“Data Tide’s three coordinating patterns—Aqua Rhythm, Biome and River Code—feature a combination of solid, heathered and twisted yarns for a dimensional texture that reflects water’s movement. The patterns are designed to work together and independently in a product suite, maximizing creative vision and inspiring a relationship with nature,” said Royce Epstein, A&D design director for Mohawk.

The Data Tide collection is just one element of Mohawk’s sustainability program, The Waterways Project. The project features products, technologies, and initiatives aimed at protecting and restoring riverways. In addition to the designs themselves encouraging mindfulness of aquatic ecosystems, the products were constructed to be toxin-free and socially responsible and to have a positive impact on the environment.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Architectural Power for the Modern Campus Landscape

    For generations, an outdoor classroom only required a textbook and a patch of grass. Today, not only has the laptop replaced the printed pages, the rise of agile learning has turned campuses into study halls with students listening to lectures and researching topics from quads, gardens, and plazas. The challenge for architects and facility managers is to provide connectivity without cluttering the landscape with visual eyesores or creating safety hazards with extension cords.

  • Colorado School District Breaks Ground on Unified PK–12 Campus

    The Haxtun School District No. Re-2J in Haxtun, Colo., recently announced that ground has been broken on a renovation/addition project that will unite its two schools, Haxtun Elementary and Haxtun Jr/Sr High School, according to a news release.

  • Q&A: How to Prevent Kitchen Grease Fires in Commercial Kitchens

    School cafeterias and university dining halls serve thousands of meals daily, relying on high-heat equipment like fryers, grills, and ovens. While these operations keep students fed, they also generate significant grease-laden vapors. Without proper controls, this grease becomes a silent fire threat. As a certified exhaust cleaning specialist and business coach who has helped hundreds of institutional facilities achieve NFPA 96 compliance, I emphasize that proactive grease management isn’t optional; it’s a core fire/life safety practice.

  • Montclair State University Starts Construction on $120M STEM Building

    Montclair State University in Montclair, N.J., recently broke ground on a new $120-million Interdisciplinary Science Building, according to university news. The university partnered with HoK Architects for the project’s design, and it’s scheduled to open in time for the 2028–29 academic year.