EXTECH Provides Skylight System to Calif. Middle School

EXTECH/Exterior Technologies, Inc. has provided skylight systems for the new Spring Hill School middle school campus in Sonoma County, Petaluma, Calif. The campus opened its doors to students for the first time for the 2019-20 school year. The middle school was designed by DMARC Studio, constructed by Advanced Building Solutions, and offers a variety of indoor and outdoor learning spaces for up to 120 students.

The building features a learning center / conference room, idea lab, math center, makerspace studio including a 3D printer, and indoor and outdoor learning classrooms. A covered walkway featuring EXTECH’s skylight system connects the outdoor learning spaces, providing daylight and ventilation to students. The SKYGARD 2500 Series skylight system covers an area about 168 feet long by 6 feet wide at a consistent slope of 1:12 across the entire span.

EXTECH skylight system
Photo by Kaplan Photo, courtesy of EXTECH

Each of its 55 panels come in a variety of sizes and are made of laminated glass more than half an inch thick and framed with anodized aluminum. The aluminum is made of recycled materials.

“Our skylights not only support sustainable daylight designs, but also provide a cost-effective choice for fabrication, installation and maintenance,” said EXTECH general manager Jim Leslie. “Backed with a 10-year warranty, our skylight system continues to add value for school districts, building owners and facility managers for years to come.”

The Spring Hill School opened in 1975 to offer a Montessori-based education to students in pre-kindergarten through fourth grade. The new middle school campus expands those opportunities through eighth grade. The program includes a distinct focus on humanities, science, technology, engineering, arts and math (STEAM). This educational style and STEAM focus influenced the inclusion of nontraditional learning spaces to increase flexibility and student health and offer an aesthetic touch.

“This challenge was approached by utilizing a unique structural system that not only provides flexibility for the instructional spaces within the building, but also provides a design aesthetic inspired by the STEAM curriculum when exposed,” said DMARC. “The classrooms’ connection to the outdoors provides unique educational spaces for the students and maximizes usable space.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • UCNJ Launches $30M Modernization of Physical Education Center

    The Union College of Union County (UCNJ) in Cranford, N.J., recently broke ground on a new $30-million modernization project for its Physical Education Center (PECK), according to a news release. The college partnered with DIGroup Architecture for the project’s design, transitioning the existing 42,000-square-foot structure into a campus hub for student athletics and campus life.

  • Image credit: O

    Strategic Campus Assessment: Moving Beyond Reactive Maintenance in Educational Facilities

    While campuses may appear stable on the surface, building systems naturally evolve over time, and proactive assessment can identify developing issues before they become expensive emergencies. The question isn't whether aging educational facilities need attention. It's how institutions can transition from costly reactive maintenance to strategic asset management in a way that protects both budgets and communities.

  • Construction Begins on East Austin CTE-Focused High School

    The Del Valle Independent School District recently announced that construction has begun on a new CTE-focused high school in Austin, Texas, according to a news release. Del Valle High School will measure in at 473,338 square feet and have the capacity for 2,400 students.

  • UNT Dallas Holds Ribbon-Cutting Ceremony for $100M STEM Building

    The University of North Texas at Dallas in Dallas, Texas, recently celebrated the opening of its new, $100-million STEM Building, according to local news. The ceremony on Dec. 2 preceded the first day of classes in the facility on Jan. 12, 2026.

Digital Edition