P.K. Yonge Middle-High School Construction Complete

SchenkelShultz Architecture announced this week that construction of the Middle-High School at the P.K. Yonge Developmental Research School in Gainesville, Fla., is complete. The public, K–12 school was designed to meet the LEED Gold Certification standard as set by the U.S. Green Building Council.

Affiliated with the University of Florida College of Education, the school is known for its innovative educational curricula and programs that provide each student with an optimized learning experience and environment. The facility was also awarded first place in the Architectural Showcase presented by the Florida Education Facilities Planners’ Association (FEFPA).

P.K. Yonge Developmental Research School

“Our goal was to design a physical environment that was an embodiment of the school’s mission to ‘design, test and disseminate innovations in education,’” said J. David Torbert, partner with SchenkelShultz Architecture. “We collaborated closely with P.K. Yonge’s Leadership Team, educators and students to create a new building that prioritizes active, participatory learning within a safe and secure environment.”

The three-story building was designed to create a student-centered, flexible, and technology-rich learning environment that fosters collaboration. It features amenities like STEM labs, open collaboration areas, distance-learning labs, open collaboration spaces, and break-out spaces for small groups. It was built to replace an existing, 60-year-old facility.

The construction manager for the project was Parrish McCall Constructors.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • UNT Dallas Holds Ribbon-Cutting Ceremony for $100M STEM Building

    The University of North Texas at Dallas in Dallas, Texas, recently celebrated the opening of its new, $100-million STEM Building, according to local news. The ceremony on Dec. 2 preceded the first day of classes in the facility on Jan. 12, 2026.

  • California K–12 District Opens New Athletic Complex, Gym

    The San Mateo Union High School District (SMUHSD) in San Mateo, Calif., recently announced the completion of two new athletics facilities: a new gymnasium at Burlingame High School, and a new athletic training complex at San Mateo High School, according to a news release.

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

  • North Dakota State University Completes Music School Renovation

    North Dakota State University in Fargo, N.D., recently announced that construction on the Challey School of Music has finished, according to a news release. The university partnered with Foss Architecture & Interiors for design and Kraus-Anderson for construction services, and construction began in July 2024.

Digital Edition