Case Study: Legacy Magnet School Building

Achieving Design Goals Using Solatube Tubular Daylighting Devices

BACKGROUND
The Tustin Legacy Magnet Academy in Tustin, Calif., is at the forefront of educational curricula with a complete commitment to collective learning and the entrepreneurial spirit. With a passion to uplift students and a focus on Technology, Innovation, Design and Entrepreneurship (TIDE), the Tustin Legacy Magnet Academy sought to create a one-of-a-kind, 1,600-acre campus to empower both middle school and high school students to think, create, adapt and invent.

Legacy Magnet School Building

CHALLENGE
Flanked by two iconic structures, the U.S. Navy and Marine Corps Air Station (M.C.A.S.) North and South blimp hangars, the design team was faced with the challenge of creating a campus that would fit in with its historic neighbors, accommodate advancements in education and technology, and create a learning environment that would optimize focus, space and creativity.

The topic of budget was consistently at the discussion table, too. According to the U.S. Department of Education, U.S. schools spend approximately $8 billion a year on utilities, with 26% of that energy consumption dedicated to lighting. This exorbitant amount of energy cost is more than schools spend on textbooks and computers combined. In order to prioritize student development, the design team decided that both energy- and water-management for the campus needed to be at the forefront of the design.

SOLUTION
To properly daylight the campus and meet design goals, the Tustin Legacy Magnet Academy utilized the Solatube Brighten Up Series 290 DS units.

Solatube International worked closely with the design team to create a striking and high-performing solution which entailed placing the 30-foot-long vertical Solatube tubes inside corrugated metal tubes to create a one-of-a-kind effect where the broad spectrum daylight would perfectly illuminate the space below. The beautiful long tubes not only enhance the building design but feature minimal light loss due to Solatube’s advanced optics and superior Spectralight Infinity tubing material. Additionally, Solatube Daylight Dimmers were also fitted to each Solatube system allowing teachers and staff to adjust room daylight levels simply and easily.

The exterior design took great inspiration from the iconic M.C.A.S. hangar bay doors next door. These designs include the use of all wood-framed construction, parabolic roof assembly features, parabolic trellis assembly features and parabolic curtain walls.

RESULTS
This dynamic design resulted in an extraordinary space, delivering distinct personality to the Tustin Legacy Magnet Academy. The concept of energy savings and sustainability are demonstrated to the students throughout the campus—not just in the textbooks—and both students and teachers alike will reap the many benefits provided by natural light.

Featured

  • Recent University of Pennsylvania Projects Receive LEED Certifications

    The University of Pennsylvania in Philadelphia, Penn., recently announced that three of its recent construction projects have earned LEED certifications, according to university news. The Vagelos Laboratory for Energy Science and Technology (VLEST) received a LEED Platinum certification, Amy Gutmann Hall a LEED Gold, and the OTT Center for Track and Field a LEED silver.

  • woman looking at futuristic data display

    7 Technology Strategies for Future-Forward Facilities Management

    From college and university systems to K–12 districts, campus facilities and technology leaders must make strategic technology decisions that support both current needs and future possibilities.

  • ed tech conference calendar

    Upcoming Awards, Events & Webinars

  • Tennessee Tech Starts Construction on New ACME Building

    Tennessee Tech University recently held a groundbreaking ceremony for the new Advanced Construction and Manufacturing Engineering (ACME) Building on its campus in Cookeville, Tenn., according to university news. The $89.6-million facility is the second in a recent expansion of the College of Engineering’s buildings on campus. It’s currently scheduled to open at the end of 2028.

Digital Edition