UC Regents Approve New School of Medicine Education Building

Regents at the University of California have approved the construction of an $84-million Education Building II for the School of Medicine at UC Riverside. Hensel Phelps + CO Architects have been selected as the project’s design-build partner. Work on the project will begin shortly, and the team is scheduled to break ground early this summer.

“I would like to thank the UC Regents for their approval of this project, which will give us the space we need to grow our class sizes to 125 students per year and continue to fulfill the mission of increasing the number of physicians in the underserved inland Southern California,” said Dr. Deborah Deas, vice chancellor of health sciences and the Mark and Pam Rubin Dean of the UCR School of Medicine. “I am thrilled with the design concept that our design-build partner Hensel Phelps + CO Architects developed. There is so much to be excited about.”

University of California Riverside School of Medicine Education Building II

Design features include an outdoor plaza that will give shape to a new School of Medicine precinct on the Riverside campus. The design-build team is aiming for a LEED Platinum certification and has incorporated environmentally sensitive building systems into the design. These include solar panels, advanced mechanical systems, and thermally insulating materials that will minimize energy consumption.

“We have partnered with Hensel Phelps on other strategic pursuits for the University of California and have highly refined the process to deliver exceptional buildings,” said James Simeo, FAIA, principal at CO Architects and the project’s design lead. “We anticipate the completion of the UCR School of Medicine’s Education Building II approximately two years after groundbreaking. The new, five-story facility will create a new home for the School of Medicine, prioritizing collaborative spaces for students, faculty and staff.”

A video overview of the new space is available online.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • textured paper collage shows a school building on fire as a fire truck sprays water into the flames

    Why a Fire Loss Is More than Flames

    We've all seen what fire damage can do to a property, but the types of damage building owners often encounter after a fire loss can exceed expectations. Having full awareness of the different forms of damage properties can sustain helps owners respond faster, reduce continued damage, and get back on the road to recovery in short order.

  • classroom with crystal ball on top of a desk

    Call for Opinions: Spaces4Learning 2026 Predictions for Educational Facilities

    As 2025 winds to a close, the Spaces4Learning staff is asking its readers—school administrators, architects, engineers, facilities managers, builders, superintendents, designers, vendors, and more—to send us their predictions for educational facilities in 2026.

  • El Paso District Breaks Ground on New Elementary School

    The Canutillo Independent School District in El Paso, Texas, recently announced that construction has begun on a 119,000-square-foot elementary school, according to a news release. The district partnered with Pfluger Architects, Carl Daniel Architects, and LDCM Solutions on the new Davenport Elementary School, which has an expected completion date of 2027.

  • UNT Dallas Holds Ribbon-Cutting Ceremony for $100M STEM Building

    The University of North Texas at Dallas in Dallas, Texas, recently celebrated the opening of its new, $100-million STEM Building, according to local news. The ceremony on Dec. 2 preceded the first day of classes in the facility on Jan. 12, 2026.

Digital Edition