Golden West College Starts Construction on Language Arts Complex

Construction on a new language arts complex recently began at Golden West College in Huntington Beach, Calif. The college is partnering with Sundt Construction, Inc., on the facility.

“We are excited to continue working on the Golden West campus,” said John Messick, Sundt’s Project Director for the California District Building Group. “Building infrastructure to support remote, in-person or hybrid learning is critical to the success of today’s students.”

The new complex will measure in at 72,251 square feet and stand three stories tall, featuring classrooms and a large reading, writing and resource center. The facility will house lecture spaces for the college’s world languages, ASL, English and speech programs. Other amenities will include gathering, office and support spaces; natural daylighting fixtures; modern LED fixtures; HVAC improvements; and native landscaping.

Project architect HMC designed the complex as two wings connected by a second- and third-floor internal bridge. “Guided by the principle of ‘connection,’ we designed the building to not only connect with the campus aesthetic, but also to provide opportunities for students to connect with campus touchpoints and classmates,” said HMC Design Principal Brett Leavitt.

The HMC Architects’ website also notes that design strategies like natural daylighting and native landscaping give the complex a head start on becoming a Zero Net Energy Building.

The first step of the construction process was the demolition of the long-standing humanities building and health sciences facility. Construction is scheduled for completion by the end of 2021.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • sapling sprouting from a cracked stone

    Lessons in Resilience: Disaster Recovery in Our Schools

    Facility managers play a pivotal role in how well a school weathers and recovers from a crisis. Whether it's a hurricane, a flood, a tornado, or a man-made event, preparation determines resilience.

  • classroom with crystal ball on top of a desk

    Call for Opinions: Spaces4Learning 2026 Predictions for Educational Facilities

    As 2025 winds to a close, the Spaces4Learning staff is asking its readers—school administrators, architects, engineers, facilities managers, builders, superintendents, designers, vendors, and more—to send us their predictions for educational facilities in 2026.

  • Different Starting Points, Same End Goal

    Higher education campuses can enhance student experience by implementing mobile credentials to streamline building access, on-campus payments, and access to other amenities. This enables students to connect to their campuses through the technology they use most: their mobile devices.

  • Construction Begins on East Austin CTE-Focused High School

    The Del Valle Independent School District recently announced that construction has begun on a new CTE-focused high school in Austin, Texas, according to a news release. Del Valle High School will measure in at 473,338 square feet and have the capacity for 2,400 students.

Digital Edition