Fort Knox to Replace 63-Year-Old Elementary School

The Department of Defense Education Activity (DoDEA) has announced a new elementary school on the grounds of Fort Knox in Kentucky. It will replace the existing, 63-year-old facility for Van Voorhis Elementary School with what a news release calls a “state-of-the-art, 21st-century school.”

“All of our schools at Fort Knox are well known for providing a high-quality education for on-post children, and though it’s the oldest school on post, Van Voorhis Elementary is no different,” said Fort Knox Garrison Commander Col. Lance O’Bryan. “The staff at that school have done a truly wonderful job teaching our children with the tools at their disposal, so with a brand-new facility and the latest technology, the sky’s the limit.”

Van Voorhis is one of four DoDEA schools at Fort Knox, alongside Kingsolver Elementary School, Scott Intermediate School and Fort Knox Middle High School. Construction work on the new facility will be done by the U.S. Army Corps of Engineers’ Louisville District. Work is scheduled to begin during the current academic year and be finished in time for the 2024­–25 school year. The facility will measure in at 104,000 square feet and cost about $58.9 million.

“You could hear exclamations of joy across the school when we learned the new school is on its way,” said Van Voorhis Elementary School Principal Angelique Johnson. “Everyone is looking forward to stepping into a new Van Voorhis Elementary School. Teachers love the idea of collaborative spaces, and the students love the idea of being connected to the outdoors. We cannot wait.”

According to a news release, all DoDEA schools take a “student-centered, participatory and experientially oriented” approach to school design. The facilities are designed within an open neighborhood concept that allows all students in a given neighborhood to work and collaborate during the day. Each grade level has its own multipurpose space surrounded by various-sized instructional spaces for breakout group work or one-to-one instruction.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • School Construction Projects Boom as Education Systems Address Aging Facilities and Growth

    Construction opportunities are almost always abundant, but currently there are more than usual construction projects being launched for public school campuses. Common objectives include major renovation or expansion of aging facilities, total replacement of inefficient classrooms, upgrades to lighting, technology, and security equipment, and adding new sports and cultural facilities.

  • KI Wall Demonstrates New Solutions at NeoCon 2025

    KI Wall attended NeoCon 2025 in Chicago, Ill., last month to showcase its new architectural wall systems and collaborations, according to a news release. Its customizable, design-forward wall solutions are intended to support creativity in work, education, and healthcare environments.

  • ClassVR headsets

    Avantis Education Revamps Hardware for ClassVR Solution

    Avantis Education recently announced the launch of two new headsets for its flagship educational VR/AR solution, ClassVR. According to a news release, the Xcelerate and Xplorer headsets expand the company’s offerings into higher education while continuing to meet the evolving needs of K–12 users.

  • The Role of Unified Communications in Hyflex Education

    Academic technology and pedagogy have evolved in ways few could have imagined a decade ago. Today, hybrid/flexible (or hyflex) learning environments — a mix of in-person and remote instruction — are the new normal. However, as promising as it sounds, making hyflex work smoothly is no small feat.

Digital Edition