Nebraska Town Breaks Ground on New High School

A groundbreaking ceremony was held this week for a new high school in Boys Town, Neb. The three-story, 110,000-square-foot facility will stand on the site of the small town’s previous high school, which was built in 1948 and was recently demolished to make room for construction. The project comes with a budget of $30 million and is currently scheduled for completion in August 2023.

“This school will serve as our incubator for educational concepts that we will teach to over 500 schools a year, including many right here in Nebraska,” said Father Steven Boes, Boys Town’s national executive director.

The facility will have the capacity for the district’s estimated 350 high-school students. About 80% of students arrive at the school with distinct academic deficiencies or behavior challenges, said a Boys Town spokeswoman, but 97% proceed to graduate from high school or continue their education.

According to local news sources, the village of Boys Town was founded in 1917 by the Rev. Edward J. Flanagan. Also known as “Father Flanagan’s Boys’ Home,” the town is dedicated to the treatment, care, and education of at-risk children.

“This new education center will help Boys Town continue to provide a safe and inspiring learning experience for our students,” said Boes. “We continue to make improvements on our campus as the needs of our children change.”

According to the Boys Town website, the Boys Town Education Center will feature amenities like science labs, state-of-the-art technology, adaptive indoor and outdoor classroom environments, a Maker’s Space, a multilevel media center, common spaces, a quiet gathering space for prayer and meditation, and centralized offices for administration and the behavioral intervention team.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Q&A: How to Prevent Kitchen Grease Fires in Commercial Kitchens

    School cafeterias and university dining halls serve thousands of meals daily, relying on high-heat equipment like fryers, grills, and ovens. While these operations keep students fed, they also generate significant grease-laden vapors. Without proper controls, this grease becomes a silent fire threat. As a certified exhaust cleaning specialist and business coach who has helped hundreds of institutional facilities achieve NFPA 96 compliance, I emphasize that proactive grease management isn’t optional; it’s a core fire/life safety practice.

  • Myrtle Grove Elementary

    Phased Construction Keeps Students on Campus During Rebuild

    When Escambia County School District needed to replace most of Myrtle Grove Elementary School in Pensacola, Fla., it had three distinct challenges: honor the school's legacy in the community, bring state-of-the-art learning environments to the county, and be seamlessly built on the same site as the active school campus.

  • GeoCam and UCLA: Modernizing Campus Accessibility Mapping

    In early 2025, UCLA partnered with GeoCam to capture and modernize its pedestrian infrastructure data. The goal was ambitious but clear: to produce a high-accuracy, imagery-backed digital map of every sidewalk, pathway, ramp, and ADA-related feature on UCLA’s 419-acre campus.

  • Phoenix School District Breaks Ground on New Prep Academy

    The Creighton Elementary School District near Phoenix, Ariz., recently broke ground on a campus replacement for Biltmore Preparatory Academy, according to a news release. The new space will allow the school to expand its enrollment by 50 percent for K–8 students and accommodate modern, collaborative learning styles.