Mitsubishi Electric Trane HVAC US Announces Platform Upgrade

Mitsubishi Electric Trane HVAC US (METUS), a joint venture between Trane Technologies PLC and Mitsubishi Electric US, Inc., announced recently that it has launched an upgrade for its Building Connect+ platform. METUS is a leading supplier of ductless and ducted mini-split and variable refrigerant flow (VRF) heat-pump and air-conditioning solutions, while Building Connect+ serves as a cloud-based controls and monitoring platform.

The platform is a pre-engineered and allows for the control and management of CITY MULTI systems, as well as third-party devices that have BACnet connectivity. It reduces the initial installation, pairing costs and commissioning time via a web-based portal. It requires no programming, software, or licenses to control or monitor units.

A press release explains that Building Connect+ makes use of an on-site panel to connect central controllers and third-party equipment to the cloud-based platform. It can auto-discover and connect up to four centralized controllers, 200 indoor units and 10 BACnet devices. One or multiple panels can also be added under a single cloud account, allowing for an increase in connectable units, the expansion of remote access across multiple locations and the expansion of the number of connected users.

“We’re pleased to introduce this expansion of the Building Connect+ platform for our customers,” said Steve Vogel, product manager, controls product planning for Mitsubishi Electric Trane HVAC US. “We listened to what our customers were saying about their system requirements. As a result, we increased the Building Connect+ application use cases and capabilities.”

The Building Connect+ customizable dashboards allow users access to the User Management console, VRF system overview, BACnet equipment overview, Maintenance tool Data, Alarming, Scheduling, Trending and Auto Changeover setup. Other system features include secure, cloud-based connectivity; event logs to track events, actors and resolution; Auto Import functionality; pre-programmed applications; alarm notifications and displays for all connected equipment; local and remote web connectivity via personal devices; and real-time data trending and export capabilities.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Architectural Power for the Modern Campus Landscape

    For generations, an outdoor classroom only required a textbook and a patch of grass. Today, not only has the laptop replaced the printed pages, the rise of agile learning has turned campuses into study halls with students listening to lectures and researching topics from quads, gardens, and plazas. The challenge for architects and facility managers is to provide connectivity without cluttering the landscape with visual eyesores or creating safety hazards with extension cords.

  • Colorado School District Breaks Ground on Unified PK–12 Campus

    The Haxtun School District No. Re-2J in Haxtun, Colo., recently announced that ground has been broken on a renovation/addition project that will unite its two schools, Haxtun Elementary and Haxtun Jr/Sr High School, according to a news release.

  • Q&A: How to Prevent Kitchen Grease Fires in Commercial Kitchens

    School cafeterias and university dining halls serve thousands of meals daily, relying on high-heat equipment like fryers, grills, and ovens. While these operations keep students fed, they also generate significant grease-laden vapors. Without proper controls, this grease becomes a silent fire threat. As a certified exhaust cleaning specialist and business coach who has helped hundreds of institutional facilities achieve NFPA 96 compliance, I emphasize that proactive grease management isn’t optional; it’s a core fire/life safety practice.

  • Montclair State University Starts Construction on $120M STEM Building

    Montclair State University in Montclair, N.J., recently broke ground on a new $120-million Interdisciplinary Science Building, according to university news. The university partnered with HoK Architects for the project’s design, and it’s scheduled to open in time for the 2028–29 academic year.