Georgia District Breaks Ground on $118M K–12 Facility

A groundbreaking ceremony was held on Thursday, Sept. 30, for a new K–12 Multi-Campus facility for Savannah-Chatham County Public Schools in Garden City, Ga. The facility comes with an estimated price tag of $118 million and will cover almost 400,000 square feet. The facility will consolidate students from three local schools—Gould Elementary School, Mercer Middle School and Groves High School—underneath one roof, and it is scheduled to open in August 2023. The school is being built on the former site of Groves High School.

The campus will include amenities like a digital media lab; CTAE labs for aviation and logistics as well as business and family consumer sciences; a football stadium; a track-and-field area; soccer fields and tennis courts; a baseball field and softball field; two indoor gyms; and a 750-seat, two-story auditorium featuring a full-size performance stage. The campus will feature three paved parking lots with a capacity for 660 cars. Construction also includes the installation of a new traffic signal and the campus’ entrance for more controlled traffic flow.

The facility will have a capacity for 2,400 students. It is being funded through Education Special Purpose Local Sales Tax III dollars. The district is partnering with Charles Perry Partners, Inc., for construction.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Niles West High School Natatorium Renovation

    Natatoriums are highly specialized spaces, and luminaires in this setting face several unique challenges. Perhaps the most significant is corrosion, which is exacerbated by high indoor humidity, condensation, and pool chemicals, often resulting in material degradation in luminaires not certified to perform in corrosive environments.

  • Harvard Announces Replacement Facility for Native American Program

    Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP).

  • Massachusetts K–12 District Selects Architect for New Junior High

    Swansea Public Schools in Swansea, Mass., recently announced that it has selected Finegold Alexander Architects to design a new junior high school for the district, according to a news release. The firm will create the Feasibility Study and Schematic Design for Joseph Case Junior High School after a lengthy selection process by the Massachusetts School Building Authority (MSBA).

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.