Silicon Valley Debuts New Elementary School

A new elementary school recently opened in Foster City, Calif., as part of the San Mateo-Foster City School District (SMFCSD). Beach Park Elementary School lies in the Silicon Valley area, about halfway between San Jose and San Francisco, Calif. The district partnered with design firm HMC Architects and general contracting firm C. Overaa & Co. The facility has a capacity of 420 students and was funded through the Measure X bond measure. The bond was passed by voters in 2016 and set aside $148 million to address overcrowding issues in schools.

According to a press release, the school features amenities like classroom clusters with shared indoor and outdoor collaboration areas; a flexible Library/Media Center featuring small group instructional rooms, learning nooks and quiet areas; a multipurpose building with a kitchen and server; flexible furniture placed throughout the building; and accent colors of terracotta, blue and green that represent the school’s vision. It also has 17 individual classrooms, an administration building and an outdoor play area.

As of February 2021, the facility’s budget was an estimated $80 million.

“The school is designed for flexibility and embraces NextGen learning modalities,” said Marko Blagojevic, managing principal of the HMC San Jose studio. “The design team developed classroom clusters, learning nodes and indoor and outdoor collaboration areas in order to heighten indoor-outdoor spatial relationships, flexible learning environments and shared collaboration spaces. It is incredibly rewarding to see excited students and teachers engage in such a setting and take ownership of their environment.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • UNT Dallas Holds Ribbon-Cutting Ceremony for $100M STEM Building

    The University of North Texas at Dallas in Dallas, Texas, recently celebrated the opening of its new, $100-million STEM Building, according to local news. The ceremony on Dec. 2 preceded the first day of classes in the facility on Jan. 12, 2026.

  • Niles West High School Natatorium Renovation

    Natatoriums are highly specialized spaces, and luminaires in this setting face several unique challenges. Perhaps the most significant is corrosion, which is exacerbated by high indoor humidity, condensation, and pool chemicals, often resulting in material degradation in luminaires not certified to perform in corrosive environments.

  • Upcoming University of Alabama Performing Arts Center Hits Construction Milestone

    The University of Alabama in Tuscaloosa, Ala., recently celebrated the topping out of its new Smith Family Center for Performing Arts, according to a news release. The university is partnering with HPM for program and project management on the facility, which broke ground in 2023 and is scheduled for completion in November 2026.

  • Abstract tech network data connections with orange, blue glowing dots, lines

    3 Trends for Higher Education to Stay Ahead of in 2026

    As universities enter the new year, the question is no longer whether digital transformation is necessary, but how quickly institutions can convert technological potential into strategic advantage.

Digital Edition