Marquette University Announces Renovated Wellness and Recreation Facility

Marquette University in Milwaukee, Wis., recently revealed plans for a major renovation to the Helfaer Tennis Stadium and Recreation Center. The building will be reimagined as the Wellness + Recreation facility, and it will unite the school’s fitness and recreation services with its counseling center and medical clinic under one roof. A news release reports that the $80-million, 180,000-square-foot project is tentatively scheduled for completion by the end of 2024, pending the available funds.

The university is partnering with HOK and Workshop Architects to renovate the existing recreation center and build a new, three-story wellness tower. The tower will play home to the Marquette University Medical Clinic, the Counseling Center, and dedicated spaces for sexual violence prevention and alcohol and drug recovery programs. It will also include a variety of flexible and multipurpose spaces for group meetings.

Marquette Wellness Recreation Center
Photo credit: HOK and Workshop Architects

“This will be a transformational project for our campus, particularly our students,” said Marquette University President Michael R. Lovell. “Not only is this facility a key part of our Campus Master Plan, but it is also truly about building a culture of wellness at Marquette. When complete, the facility will position recreation, fitness, clinical and mental health services under one roof.”

New recreational amenities will include a large gym with basketball courts, fitness space and equipment, group fitness studios, a spin studio, tennis courts, a swimming pool, and administrative space for campus recreation staff. Construction crews will use the existing building footprint and parts of its structure but will replace all interior building systems.

“Marquette’s vision for the Wellness + Recreation Center acknowledges the relationship between physical activity and student mental health, well-being and academic success,” said Peter van den Kieboom, principal and architect at Workshop Architects. “Workshop is honored to have played our part in this important initiative, and we look forward to our continued collaboration.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Embry-Riddle Completes Construction on Research, Lab Facility

    Embry-Riddle Aeronautical University (ERAU) in Daytona Beach, Fla., recently announced the end of construction on a new research and lab facility on campus. The Center for Aerospace Engineering II (CAT II) will support aerospace research and technology development and broke ground last summer.

  • Designing the Bridge Between Inclusivity and Independence in K–12 Schools

    Fostering independence is fundamental to learning and development for K–12 students. It offers many proven benefits, such as enhanced confidence, problem-solving, decision-making, and social skills. However, this foundational objective loses its impact if it’s not accessible and adaptable to all students. Inclusivity plays a critical role in cultivating independence and healthy autonomy for students, fostering positive student learning outcomes by uniting pedagogy with the physical learning environment.

  • Year-Round Schools Require Year-Round Indoor Air Quality Planning

    While many schools are out for the summer, year-round schools follow a more “balanced” schedule with shorter, more frequent breaks spaced throughout the school year. Even though this offers educational benefits, these facilities have less downtime for building maintenance. This can become an issue when facilities managers overlook the importance of routine HVAC maintenance and air duct cleaning services.

  • Planning with Clarity: Using AI to Make Better Campus Decisions, Not Just Better Designs

    Higher education leaders are being asked to make increasingly high-stakes decisions about campus facilities amid greater uncertainty than ever before. Social and economic pressures, shifting enrollment, and evolving learning models compete with growing deferred maintenance needs to strain even the most robust infrastructure budgets.