Bucknell University to Build New Residence Halls

Bucknell University in Lewisburg, Pa., recently announced that it will build four apartment-style residence halls over the next two years. The new housing facilities will replace an existing complex of residential units known as “The Mods,” which are more than 50 years old. A press release reports that each unit will have space for 70 beds for a total capacity of 280 students.

The new residence halls will stand three stories and feature the university’s traditional red-brick exterior. They will feature apartments of various sizes with shared kitchen and bath spaces, and each residence hall will have four student lounge areas and laundry facilities. The new dorms’ design will also include geothermal heating and cooling systems.

“These new, apartment-style residence halls should provide students a substantial upgrade from ‘The Mods,’ which are in need of replacement,” said Fritz Family Dean of Students Amy Badal. “Based on student feedback, we have made a greater commitment to outdoor recreation options for students on campus, and the amenities found at these new student housing units represent a model for what we envision across campus moving forward.”

Bucknell West Residence Hall
Rendering courtesy of Gensler

According to the news release, half of “The Mods” will be demolished after the end of the fall 2022 semester, and the first two residence halls are scheduled to open at the beginning of fall 2023. The other half of the old facility will be replaced with the second pair of new buildings in time for the fall 2024 semester. The university will make alternate on-campus housing arrangements for students displaced by the demolition and construction. They will also feature modular elements that will reportedly shorten the construction schedule by about a year.

The four new buildings will also form the borders of an outdoor recreation area scheduled to feature an amphitheater, fire pit, volleyball court and ping pong tables, grills and additional seating.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Minnesota District Opens New PreK–12 School

    Gibbon-Fairfax-Winthrop Schools in Gibbon, Minn., recently announced that construction is complete on a new, $68.9-million school for students in grades PreK–12, according to a news release.

  • University of Mary Washington Selects Builder for New Theater, Dance Facility

    The University of Mary Washington in Fredericksburg, Va., recently announced that it has selected construction and development firm Skanska to lead a series of renovations and upgrades to fine arts facilities, according to a news release.

  • California District Opens New Robotics Center

    The Fremont Union High School District (FUHSD) in Cupertino, Calif., recently held a Grand Opening ceremony for a new, district-wide Robotics Center, according to a news release. The 14,500-square-foot facility was designed by Quattrocchi Kwok Architects (QKA); Landmark Constructors served as the builder and Blach Construction as general construction manager.

  • Year-Round Schools Require Year-Round Indoor Air Quality Planning

    While many schools are out for the summer, year-round schools follow a more “balanced” schedule with shorter, more frequent breaks spaced throughout the school year. Even though this offers educational benefits, these facilities have less downtime for building maintenance. This can become an issue when facilities managers overlook the importance of routine HVAC maintenance and air duct cleaning services.