NYU to Open New Academic Center in Greenwich Village

New York University in New York City is getting ready to open its newest academic building, the John A. Paulson Center. The 735,000-square-foot vertical campus in Greenwich Village was designed by Davis Brody Bond and KieranTimberlake, according to a news release, and its purpose is to both demonstrate and encourage students’ academic and social lives. The facility includes academic, athletic, performing arts, and residential space, as well as common areas and a pedestrian corridor open to the public.

The center is named after NYU alumnus John A. Paulson, who contributed a $100-million gift toward the building’s construction. A news release reports that the gift is the largest that the NYU Washington Square Campus has ever received, as well as the largest building that NYU has built in the Washington Square core. Construction began in 2016, and the building is scheduled to open this month.

“Great cities need great universities, and universities need space to fulfill their academic missions,” said NYU President Andrew Hamilton. “The Mercer site [named for the building’s placement on Mercer Street] is a once-in-a-generation campus building, and its singleness is matched only by the uncommon generosity of John Paulson’s extraordinary gift. We are honored by his support for the University and particularly this building, which fulfills so many crucial needs for NYU now and far into the future. We are immensely grateful to him, and thrilled to recognize him by naming the building the John A. Paulson Center.”

The Paulson Center features 58 classrooms; athletic facilities for men’s and women’s basketball, fencing, wrestling, volleyball, and squash, as well as a six-lane pool; performance spaces including a proscenium theater, warehouse theater, orchestra ensemble room, and support space for the School of Music; three residential towers with space for 407 freshmen and 42 faculty apartments; communal study spaces; 25,000 square feet of green roof space; and high-efficiency heating and cooling systems, according to the news release.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Moline-Coal Valley School District to Consolidate Two Schools into New Facility

    The Moline-Coal Valley School District in Moline, Ill., recently broke ground on a new elementary school that will consolidate the students and staff from two existing schools, according to local news. Robert Ontiveros Elementary School will serve as the new home for Lincoln-Irving Elementary School and Willard Elementary School.

  • Tennessee Middle School Completes Health, Life Safety Renovations

    The Giles County Board of Education in Pulaski, Tenn., recently announced that a series of renovation projects has been completed at Bridgeforth Middle School, according to a news release. The district partnered with Wold Architects & Engineers and Brindley Construction to modernize building systems at one of the district’s oldest schools.

  • Photo courtesy of Kraus-Anderson

    Minnesota District Completes $49.7M Addition, Renovation Project

    St. Paul Public Schools in St. Paul, Minn., recently announced the completion of a $49.7-million addition and remodeling project at two district schools, according to a news release.

  • California School District Completes Elementary School Modernization

    The San Diego Unified School District in San Diego, Calif., recently held a ribbon-cutting for a whole-site modernization of Pacific Beach Elementary School, according to local news. The school first opened with one building in 1930 and added six more between 1938 and 1957.