Kraus-Anderson Completes $122M Career Academy High School

The office of Kraus-Anderson Construction Company in Duluth, Minn., recently announced that construction is complete on the new Rock Ridge Career Academy High School in Virginia, Minn. According to a news release, the school measures in at 280,000 square feet and was designed by Cuningham Group Architecture and local firm DSGW Architects.

Amenities include an open main commons area; active learning studios and lab spaces; a CTE center; and labs for carpentry, metals, automotive work, culinary arts, and certified nursing assistant (CNA) skills. It also features a pool, gymnasium, and small- and large-scale collaboration spaces.

The school offers a wide variety of career tracks within three academies. According to the news release, the career tracks include “(1) Business Management, Administration, Arts, Communications and Information Systems; (2) Health and Human Services; and (3) Agriculture, Food, Manufacturing, Construction, Engineering and Science.” The news release reports that Rock Ridge Career Academy High School serves as the only wall-to-wall career academy school in the U.S. north of the Twin Cities area.

“Rock Ridge High School was built to be a world-class school. It was specifically designed for both direct instruction and project-based learning to flourish as teaching and learning tools in a career academy structure for all students,” said Rock Ridge Public Schools Superintendent Dr. Noel Schmidt. “It is no hyperbole to say that the community, teachers, and students can be proud of this extraordinary high school, which will be the envy of many districts throughout the State of Minnesota and United States. It is that unique.”

The school’s construction began in 2020, according to the news release.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Hawaii Elementary School Breaks Ground on New Classroom Building

    Kealakehe Elementary School in Kailua, Hawaii, recently began construction on a new, $16-million classroom building for its campus, according to a news release. The 13,000-square-foot building will stand two stories and connect the existing upper and lower campuses.

  • From Approval to Opening: Inside Travis Unified School District’s Fast Tracked Campus Expansion

    The Travis Unified School District (TUSD) in northern California includes several elementary and high schools serving over 5,400 students. In 2024, the TUSD Board approved the addition of sixth grade to the Golden West Middle School campus for the 2025–26 school year, setting in motion an accelerated effort to bring new facilities online in less than a year.

  • Embry-Riddle Completes Construction on Research, Lab Facility

    Embry-Riddle Aeronautical University (ERAU) in Daytona Beach, Fla., recently announced the end of construction on a new research and lab facility on campus. The Center for Aerospace Engineering II (CAT II) will support aerospace research and technology development and broke ground last summer.

  • Deferred Maintenance Issues Growing at Universities, Gordian Reports

    U.S. colleges and universities are falling increasingly behind on facilities maintenance and repair, according to Gordian’s 13th annual State of Facilities in Higher Education report. The deferred capital renewal burden has reached $156 per gross square foot, an 8% increase over the previous year.