Kraus-Anderson Completes $122M Career Academy High School

The office of Kraus-Anderson Construction Company in Duluth, Minn., recently announced that construction is complete on the new Rock Ridge Career Academy High School in Virginia, Minn. According to a news release, the school measures in at 280,000 square feet and was designed by Cuningham Group Architecture and local firm DSGW Architects.

Amenities include an open main commons area; active learning studios and lab spaces; a CTE center; and labs for carpentry, metals, automotive work, culinary arts, and certified nursing assistant (CNA) skills. It also features a pool, gymnasium, and small- and large-scale collaboration spaces.

The school offers a wide variety of career tracks within three academies. According to the news release, the career tracks include “(1) Business Management, Administration, Arts, Communications and Information Systems; (2) Health and Human Services; and (3) Agriculture, Food, Manufacturing, Construction, Engineering and Science.” The news release reports that Rock Ridge Career Academy High School serves as the only wall-to-wall career academy school in the U.S. north of the Twin Cities area.

“Rock Ridge High School was built to be a world-class school. It was specifically designed for both direct instruction and project-based learning to flourish as teaching and learning tools in a career academy structure for all students,” said Rock Ridge Public Schools Superintendent Dr. Noel Schmidt. “It is no hyperbole to say that the community, teachers, and students can be proud of this extraordinary high school, which will be the envy of many districts throughout the State of Minnesota and United States. It is that unique.”

The school’s construction began in 2020, according to the news release.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • DFW-Area District Opens New Replacement Middle School

    The Eagle Mountain-Saginaw Independent School District near Fort Worth, Texas, recently held a ribbon-cutting ceremony for a new replacement middle school campus, according to a news release. The new facility for Wayside Middle School, originally established in 1964, was built on the site of the former district administration building and funded through Bond Proposition A in 2023.

  • Campus Safety Requires Using Every Resource Available

    Across the U.S., school and campus leaders are facing a security landscape that has changed dramatically over the past decade. Incidents on school property have increased in recent years, with several consecutive years setting record totals. According to analysis of data by CNN, dozens of shootings now occur on school grounds annually across K-12 and higher education environments.

  • Full Sail University Announces First Student Housing Facility

    Full Sail University in Winter Park, Fla., recently announced that development has begun on its first student housing community, according to a news release. The university is partnering with Nvision Development for construction and long-term management of the facility, which will stand five stories and have the capacity for more than 570 beds.

  • blurry image capturing students navigating crowded hallways between classes

    How Human Behavior Data Is Reshaping Campus Facilities Management

    The ebb and flow of students, faculty, and administrators across a campus have a larger impact on maintenance, cleaning, and sustainability than many realize.