Perkins Eastman Tops Out Net Zero Energy High-School Building

Architecture firm Perkins Eastman recently participated in a topping out ceremony for the new facility for Alexandria City High School at its Minnie Howard Campus in Alexandria, Va., according to a news release. The facility will have a capacity for 1,600 students and has an expected completion date of 2025. The building’s design is part of the Alexandria City Public Schools’ Connected High School Network (CHSN) initiative, whose goal is to reimagine high-school education and the city’s capacity needs.

“It is an honor to have worked with the school and community of Alexandria to create a design that celebrates ACHS’ legendary Titan culture while providing a new environment that will inspire more active and experiential learning and promote the health and well-being of students, staff, and the entire community,” said Sean O’Donnell, Perkins Eastman Principal, who leads the group’s K–12 practice. “This new building will complement the existing King Street campus to redefine the high-school experience for future generations of Alexandrians and become a central part of Alexandria’s innovative model for a connected high school network.”

According to the news release, the new school will feature amenities like interdisciplinary communities; labs for science, art, and CTE; a library/learning commons area; and administrative and counseling space. CTE spaces will accommodate subjects like “renewable energy, aerospace, cybersecurity, robotics, nursing, pharmacy, and surgical tech.” The school will also include “Creative Commons” dining areas, two gyms, an aquatics facility, an early childhood center, a teen wellness center, and more.

The facility is also on track to achieve Net Zero Energy and LEED Gold Certification, according to the news release, which bears special mention because of the aquatics facility. The news release reports that sustainable and high-performance design strategies include optimized enclosure designed to minimize energy loss; efficient systems thanks to a geothermal wellfield; Photovoltaic (PV) panels on the roof; low-flow water fixtures; and choice of healthy building materials that minimize the negative impact on the environment.

“The shared vision for this school resulted in a building that will enhance education, enrich Alexandria’s community, and serve as a national model of sustainable, high-performance school design,” said Omar Calderón Santiago, AIA, Design Principal with Perkins Eastman.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • FAU Starts Construction on Holocaust and Jewish Studies Building

    Florida Atlantic University recently began construction on a new academic building for its campus in Boca Raton, Fla., according to university news. The Kurt and Marilyn Wallach Holocaust and Jewish Studies Building will stand two stories, measure in at 22,000 square feet, and play home to the university’s Holocaust education and Jewish studies programs.

  • Texas District Finishes Construction on New Middle School, Admin Building

    The Westwood Independent School District recently held a ribbon-cutting ceremony for the new Westwood Middle School and Administration Building in Palestine, Texas, according to a news release. The campus covers 106,000 square feet and has the capacity for 650 students in grades 6–8, and it will also play home to the district’s staff and administration.

  • textured paper collage shows a school building on fire as a fire truck sprays water into the flames

    Why a Fire Loss Is More than Flames

    We've all seen what fire damage can do to a property, but the types of damage building owners often encounter after a fire loss can exceed expectations. Having full awareness of the different forms of damage properties can sustain helps owners respond faster, reduce continued damage, and get back on the road to recovery in short order.

  • Pudu Robotics Launches AI-Powered, Large-Scale Floor Sweeper

    Pudu Robotics recently launched the newest member of its MT1 series of robotic floor sweepers, the PUDU MT1 Max, according to a news release. The AI-powered, 3D perception robotic sweeper was designed for use in large, complex cleaning environments both indoors and semi-outdoors, like parking garages and semi-open building atriums.

Digital Edition