Houston-Area K–12 District Breaks Ground on New CTE Center

The Brazosport Independent School District in Freeport, Texas, recently held a groundbreaking ceremony for a new Career and Technical Education (CTE) Center at Brazosport High School, according to a news release. The 76,000-square-foot facility is being funded through a 2019 bond and has an estimated completion date of December 2024. The district partnered with VLK Architects for the building’s design.

“VLK is very fortunate to have partnered with Brazosport ISD in the design of the Brazosport High School CTE Center,” said VLK Architects Principal Monika Castillo. “The new building and addition will allow the district to continue delivering instruction for the betterment of their students’ futures.”

The new building will connect directly to the main school and offer specialized spaces for programs including cosmetology, floral design, veterinary technology, journalism, and others. It will also feature workshops for welding, architectural engineering, and construction, each with a dedicated classroom space and shop area with access to an outdoor, secured workspace. The new spaces were designed to include natural light and exterior finishes that complement the rest of campus.

The news release reports that the cosmetology lab will include installations for hair styling, pedicures and manicures, and facial treatments, while the vet tech lab will have space for animal treatment and grooming. The facility will also include a podcast room, green screen room, and control room for the school’s AV and multimedia production programs.

“Our new Career and Technical Education building will serve as a hub of innovation, fostering creativity, collaboration, and hands-on learning,” said Brazosport ISD Superintendent Danny Massey. “This facility will provide our students with access to cutting-edge technology, modern workshops, and industry-standard equipment across a wide range of disciplines. Together, we will build not only a physical structure for our students today, but also a legacy of excellence for generations to come.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Image credit: O

    Strategic Campus Assessment: Moving Beyond Reactive Maintenance in Educational Facilities

    While campuses may appear stable on the surface, building systems naturally evolve over time, and proactive assessment can identify developing issues before they become expensive emergencies. The question isn't whether aging educational facilities need attention. It's how institutions can transition from costly reactive maintenance to strategic asset management in a way that protects both budgets and communities.

  • A university

    Breaking Higher Education's Billion-Dollar Backlog Problem

    Strategic mechanical system design can transform campus maintenance backlogs. Here's how.

  • North Dakota State University Completes Music School Renovation

    North Dakota State University in Fargo, N.D., recently announced that construction on the Challey School of Music has finished, according to a news release. The university partnered with Foss Architecture & Interiors for design and Kraus-Anderson for construction services, and construction began in July 2024.

  • El Paso District Breaks Ground on New Elementary School

    The Canutillo Independent School District in El Paso, Texas, recently announced that construction has begun on a 119,000-square-foot elementary school, according to a news release. The district partnered with Pfluger Architects, Carl Daniel Architects, and LDCM Solutions on the new Davenport Elementary School, which has an expected completion date of 2027.

Digital Edition