Los Angeles Valley College Breaks Ground on Academic Complex

Los Angeles Valley College in Los Angeles, Calif., recently broke ground on a new Academic Complex Building in conjunction with Los Angeles Community College, according to local news. The 84,000-square-foot, three-story structure will replace a facility from the 1950s and include a lecture hall, computer labs, smart classrooms, and a skills demonstration and test room.

It will also play home to administrative space for the college’s departments of business administration, computer science information systems, emergency services, mathematics, psychology and statistics, and sociology/ethnic studies. Improvements to the overall site are set to include an 11,000-square-foot below-ground stormwater retention system, new pavement, and drought-tolerant landscaping.

The project has an estimated completion date of 2025, according to local news.

“We are happy with how this new facility will support and improve students’ learning,” said Board of Trustees President David Vela. “In addition to offering necessary services, the new structure will help students fulfill their educational aspirations. The Los Angeles Community College District is devoted to giving students access to high-quality, affordable educational opportunities. This will prepare them for new job paths.”

The San Fernando Valley Sun reports that the project will cost about $90 million in total.

The project, Academic Complex 1, is part of a larger $704-million renovation and building campaign to renovate its existing facilities and build new, more sustainable ones. Existing academic buildings will be outfitted with new technology and more modern energy-efficiency standards, according to the university website.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • UNT Dallas Holds Ribbon-Cutting Ceremony for $100M STEM Building

    The University of North Texas at Dallas in Dallas, Texas, recently celebrated the opening of its new, $100-million STEM Building, according to local news. The ceremony on Dec. 2 preceded the first day of classes in the facility on Jan. 12, 2026.

  • Niles West High School Natatorium Renovation

    Natatoriums are highly specialized spaces, and luminaires in this setting face several unique challenges. Perhaps the most significant is corrosion, which is exacerbated by high indoor humidity, condensation, and pool chemicals, often resulting in material degradation in luminaires not certified to perform in corrosive environments.

  • Upcoming University of Alabama Performing Arts Center Hits Construction Milestone

    The University of Alabama in Tuscaloosa, Ala., recently celebrated the topping out of its new Smith Family Center for Performing Arts, according to a news release. The university is partnering with HPM for program and project management on the facility, which broke ground in 2023 and is scheduled for completion in November 2026.

  • Abstract tech network data connections with orange, blue glowing dots, lines

    3 Trends for Higher Education to Stay Ahead of in 2026

    As universities enter the new year, the question is no longer whether digital transformation is necessary, but how quickly institutions can convert technological potential into strategic advantage.

Digital Edition