Tennant Launches Two New Walk-Behind Floor Scrubbers

Cleaning equipment and solutions provider Tennant Company recently launched two new products—the T260 and the T391—to add to its fleet of walk-behind floor scrubbers, according to a news release. The products will be available to order in October 2023.

The T260 offers a 20-inch scrubber intended for quick and straightforward use, and its size allows for easy visibility while cleaning cramped spaces. The mid-size T391 offers two scrub-path sizes, 28 inches and 32 inches. Both were designed for use in healthcare, education, retail, and public environments, the news release reports.

Features of the T260 include a one-button stop and start function; battery meter display; a recovery tank that offers full access and visibility; clear sightlines of operation; and water pick-up ability. The T391’s larger scrub path enables faster productivity and comes with larger solution and recovery tanks. Its self-leveling scrub head allows for ease of use across different surfaces. The pre-programmed standard and eco-mode settings also allow for easy operation with minimal user training.

“We’re proud to have two more reasons why facility managers should choose Tennant,“ said Pat Schottler, Tennant’s Vice President of Global Marketing. “It’s been a big year for us, as we continue to introduce new machines to help serve our customers across all facility types. At the heart of these innovations is giving the customer more options—cleaning looks different for each facility. The new T260 and T391 are great choices for customers prioritizing ease-of-use, powered by best-in-class cleaning technology and backed by the Tennant experience—all at a competitive price.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • College of the Desert Hits Construction Milestone on New Campus

    College of the Desert recently announced that the construction of its new Palm Springs Campus in Palm Springs, Calif., recently reached a major construction milestone, according to a news release. The college is partnering with general contractor C.W. Driver Companies, which recently “topped out” the facility by placing the final beam in its structure.

  • How a Portable Sink Helped an Art Classroom Run More Smoothly

    Classroom design decisions can have outsized effects on instructional time and safety at schools juggling mismatched infrastructure, strict budgets, and crowded schedules — particularly in the arts. Between spilled paint and dirty brushes, art classes run smoother with a sink in the studio. But many schools don’t have a sink in every art classroom.

  • Deferred Maintenance Issues Growing at Universities, Gordian Reports

    U.S. colleges and universities are falling increasingly behind on facilities maintenance and repair, according to Gordian’s 13th annual State of Facilities in Higher Education report. The deferred capital renewal burden has reached $156 per gross square foot, an 8% increase over the previous year.

  • Classical building columns display digital data streams

    The Campus Nervous System: Why Facilities Risk Is Now a Leadership Issue in Higher Education

    Facility performance now intersects with safety, compliance, on-campus experience, institutional reputation, and financial resilience. That places it firmly on the leadership agenda.