University of California, Riverside Breaks Ground on $285M Student Housing Facility

The University of California, Riverside recently broke ground on a new student housing project on its campus, according to a news release. The North District Phase 2 Student Housing Development will measure in at 424,000 square feet and cost an estimated $285 million. The residence facility will provide housing to both UCR students and students from the Riverside Community College District.

The university is partnering with McCarthy Building Companies, Inc. for the project’s construction. Both UCR and RCCD have experienced recent bursts in enrollment necessitating adequate, affordable housing for students.

“The McCarthy team is proud to be part of this revolutionary project, which helps bridge the gap between larger universities and community colleges,” said McCarthy Vice President Sarah Carr. “This housing development will provide affordable options that will enhance graduation rates not only for UCR students, but for Riverside City College students as well—a benefit to the entire community.”

The new facility will feature 429 single- and double-occupancy, apartment-style units with between one and four bedrooms, a kitchen, and living room space. The building will also include amenities like WiFi, air conditioning, study areas and communal spaces, a café, outdoor fields, and a park. Funding comes partially from the State Higher Education Student Housing Grant Program.

“We can’t solve all the problems that are challenges for students, but we can solve those two by bringing students to the campus, letting them live here, wear their UCR or RCC T-shirt, and just be part of the campus,” said UCR Chancellor Kim Wilcox. “It breaks down a barrier and aside from the housing, it provides them with a different sense of themselves.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • School Construction Projects Boom as Education Systems Address Aging Facilities and Growth

    Construction opportunities are almost always abundant, but currently there are more than usual construction projects being launched for public school campuses. Common objectives include major renovation or expansion of aging facilities, total replacement of inefficient classrooms, upgrades to lighting, technology, and security equipment, and adding new sports and cultural facilities.

  • KI Wall Demonstrates New Solutions at NeoCon 2025

    KI Wall attended NeoCon 2025 in Chicago, Ill., last month to showcase its new architectural wall systems and collaborations, according to a news release. Its customizable, design-forward wall solutions are intended to support creativity in work, education, and healthcare environments.

  • ClassVR headsets

    Avantis Education Revamps Hardware for ClassVR Solution

    Avantis Education recently announced the launch of two new headsets for its flagship educational VR/AR solution, ClassVR. According to a news release, the Xcelerate and Xplorer headsets expand the company’s offerings into higher education while continuing to meet the evolving needs of K–12 users.

  • The Role of Unified Communications in Hyflex Education

    Academic technology and pedagogy have evolved in ways few could have imagined a decade ago. Today, hybrid/flexible (or hyflex) learning environments — a mix of in-person and remote instruction — are the new normal. However, as promising as it sounds, making hyflex work smoothly is no small feat.

Digital Edition