Modine Offers Germicidal Air Disinfection for K–12 Schools

HVAC indoor air quality company Modine has debuted the VidaShield UV24 Active Air Disinfection System for the K–12 school market. The product line combines UV-C light irradiation with air circulating fans and an optional ceiling light, the company said.

The UV24 is a “fast, continuous air disinfectant system” that works by drawing in airborne pathogens and pollutants with a fan array, where the air passes through a MERV 6 filter to trap larger particulates while allowing pathogens to pass through to a shielded UV light chamber, Modine said. The chamber houses a 253.7 nm UV-C bulb, which neutralizes bacteria, viruses, and fungi.

The company said the system will help eliminate the SARS Covid-19 virus, coronaviruses and viruses or bacteria that cause Influenza A, the common cold, measles, mumps, tuberculosis, pneumonia, MRSA, and C Diff.

"Airborne pathogens are a significant contributor to the spread of illness, which can ultimately lead to missed school days for students," said Kimberly Raduenz, Modine’s indoor air quality division strategic marketing manager. "The CDC recommends adding germicidal solutions in high-risk areas to better combat pathogens. VidaShield UV24 … is safe for occupied spaces while also being easy to install. When combined with increased ventilation and improved filtration, this product can be the missing component for enhanced indoor air quality inside schools and other educational facilities."

For more information on the VidaShield UV24 system and download specs and other documents, visit the product page.

About the Author

Kate Lucariello is a former newspaper editor, EAST Lab high school teacher and college English teacher.

Featured

  • AP Construction Breaks Ground on Two Projects for Austin ISD

    Adolfson & Peterson Construction (AP) recently announced that it has broken ground on two renovation projects for the Austin Independent School District, according to a news release. The work at McCallum and Anderson High Schools totals 97,350 square feet and is scheduled for completion in January 2027.

  • California High School Starts Construction on STEAM, Music Buildings

    Tamalpais High School, part of the Tamalpais Union High School District, recently broke ground on two new major facilities for its campus in Mill Valley, Calif., according to a news release. The district is partnering with Quattrocchi Kwok Architects (QKA) and Lathrop Construction Associates for the Science Technology, Engineering, Arts, and Mathematics (STEAM) and Music Buildings, both replacing their outdated counterparts.

  • Elevating Campus Maintenance: How Power Wash Drones are Transforming Educational Facilities

    As today’s campuses grow larger and more architecturally complex, keeping exteriors clean, safe, and inviting has never been tougher. Facilities leaders are under constant pressure to stretch budgets, meet safety standards, and support sustainability goals—all while tackling the stubborn challenge of exterior cleaning.

  • EPA to Provide $26M in Grants to Protect School, Child Care Drinking Water

    The Environmental Protection Agency (EPA) recently announced that it will award $26 million in grant funding to test and fix lead-contaminated water at U.S. schools and childcare centers, according to local news.

Digital Edition