Fort Worth Country Day to Build New Lower School with Focus on Natural Light, Indoor-Outdoor Learning Spaces

Fort Worth Country Day

Rendering courtesy of Lake|Flato Architects

Fort Worth Country Day (FWCD), a college-preparatory school in Fort Worth, Texas, has broken ground on a new 32,720-square-foot, $25 million Lower School. Annie Richardson Bass Lower School will serve 350 students in grades 1 through 4, replacing FWCD's existing Lower School originally built in 1964, the school said in a news announcement. The institution partnered with Lake|Flato Architects for architectural design, Hocker Design for landscape architecture, and Linbeck as general contractor.

Design of the new facility will focus on providing "natural light, connections to the outdoors, tuned acoustics, and appropriate technology to expand the school's delivery of future-focused experiences and activities," the announcement said. Features of the project include:

  • A 2,130-square-foot library with floor-to-ceiling windows, a fireplace, reading nooks, adaptive furniture, soft seating, and sliding glass doors that open to an outdoor courtyard;
  • Two dedicated science labs, a collaboratory/makerspace, and study rooms for tutoring and smaller breakout sessions;
  • A window-filled commons area for special programming, class performances, lectures, and more;
  • First and second-grade wing with its own covered outdoor learning space designed to encourage exploration, collaboration, and adventure beyond the traditional classroom;
  • Third and fourth-grade wing with its own covered outdoor learning space that supports active learning and creative thinking;
  • A new playground with sports court and play structures;
  • Sustainable design features including skylights, light shelves, LED lighting, rainwater collection, and drought-tolerant landscaping with native shrubs, grasses, and water-conservation technologies;
  • Integrated technology to foster student interaction, including flat screen displays in all classrooms and learning spaces;
  • Communications and security platforms with digital signage, two-way paging, intercom system, and proximity-controlled exterior doors;
  • One access-controlled entrance for safety and security;
  • A dedicated safety shelter in the commons area, with windows and walls built to withstand 250 MPH winds in the event of a major storm or tornado; and
  • Offices for academic support coordinators, health and wellness counselors, and faculty/staff meeting rooms, as well as communal and collaborative spaces.

"Our new Lower School is designed to create exceptional learning environments within classrooms and communal spaces while delivering dramatic improvements for safety and efficiency," said Eric Lombardi, head of school at FWCD. "It will have a strong connection to our campus's amazing outdoors, while also giving our faculty and students first-class spaces to inspire the highest level of elementary-appropriate learning."

Completion of the project is slated for spring 2025.

About the Author

Rhea Kelly is editor in chief for Campus Technology, THE Journal, and Spaces4Learning. She can be reached at [email protected].

Featured

  • California K–12 District Opens New Athletic Complex, Gym

    The San Mateo Union High School District (SMUHSD) in San Mateo, Calif., recently announced the completion of two new athletics facilities: a new gymnasium at Burlingame High School, and a new athletic training complex at San Mateo High School, according to a news release.

  • LSU Breaks Ground on $200M Residential Project

    Louisiana State University in Baton Rouge, La., recently broke ground on a new residential complex, according to university news. The South Quad residential project will consist of two buildings and add a total of 1,266 beds for freshmen students. The development comes with a price tag of $200 million, and it’s scheduled to open to students in fall 2027.

  • North Dakota State University Completes Music School Renovation

    North Dakota State University in Fargo, N.D., recently announced that construction on the Challey School of Music has finished, according to a news release. The university partnered with Foss Architecture & Interiors for design and Kraus-Anderson for construction services, and construction began in July 2024.

  • UCNJ Launches $30M Modernization of Physical Education Center

    The Union College of Union County (UCNJ) in Cranford, N.J., recently broke ground on a new $30-million modernization project for its Physical Education Center (PECK), according to a news release. The college partnered with DIGroup Architecture for the project’s design, transitioning the existing 42,000-square-foot structure into a campus hub for student athletics and campus life.

Digital Edition