Virginia Tech to Start Construction on New College of Engineering

Virginia Tech in Blacksburg, Va., recently announced that it has selected global construction and development firm Skanska to build a new 285,500-square-foot facility for the College of Engineering, according to a news release. Mitchell Hall will stand five stories and take the place of the existing Randolph Hall, which is scheduled for demolition in spring 2024. After completion, Mitchell Hall will increase gross square footage by 70 percent within the same footprint and be the largest building on campus.


Rendering courtesy of Skanska

Construction will work around the university’s existing stability wind tunnel, one of the largest of its kind in the country. The building’s exterior will feature a mix of glass, precast concrete, and Hokie Stone. The interior will feature amenities like a 200-person, arena-style lecture hall, academic and administrative space, a flex research lab, and workspaces. The building will also play home to multiple departments within the College of Engineering.

“This project underscores our commitment to delivering cutting-edge academic facilities that inspire innovation and collaboration,” said Mark Balling, executive vice president with Skanska. “We have worked on many other projects at the university, and we are delighted to continue our partnership as we execute this transformative vision for engineering education.”

Construction has an estimated completion date of spring 2028, the news release reports.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Massachusetts K–12 District Selects Architect for New Junior High

    Swansea Public Schools in Swansea, Mass., recently announced that it has selected Finegold Alexander Architects to design a new junior high school for the district, according to a news release. The firm will create the Feasibility Study and Schematic Design for Joseph Case Junior High School after a lengthy selection process by the Massachusetts School Building Authority (MSBA).

  • UNL Kiewit Hall

    Designing for Engineering Excellence: Integrating Sustainability and Wellness at UNLs Kiewit Hall

    Kiewit Hall at the University of Nebraska-Lincoln exemplifies how academic institutions can integrate sustainability and wellness into modern learning environments. With an integrated and collaborative team approach, Kiewit Hall addresses enhanced learning and creativity, physical health, and mental wellness, and fosters a sense of community through innovative design, operations, and policy solutions.

  • Construction Begins on East Austin CTE-Focused High School

    The Del Valle Independent School District recently announced that construction has begun on a new CTE-focused high school in Austin, Texas, according to a news release. Del Valle High School will measure in at 473,338 square feet and have the capacity for 2,400 students.

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

Digital Edition