Florida Net-Zero High School Completes $29M Expansion Project

NeoCity Academy in Kissimmee, Fla., recently completed a 53,000-square-foot, three-story addition to its campus, according to a news release. The school partnered with construction firm Skanska on the project, which includes 26 new classrooms with collaborative learning spaces and labs. NeoCity Academy was the first net-zero high school campus in the state of Florida, the news release reports.

The expansion includes sustainability features like a photovoltaic canopy that provides solar energy as well as shade and shelter, LED lighting, and designated space for future rooftop solar panels. The project also involved detailing and expanding the school’s building envelope to reduce air leakage and control temperature, air, and humidity. Window placement and sizing were also taken into account to minimize the school’s energy use and heat gain.

“We’re excited to deliver this sustainability-focused expansion to NeoCity Academy and the School District of Osceola County,” said Skanska Vice President Daniel Abou-Jaoude. “This project is a testament to Skanska’s commitment to construct innovative and forward-thinking educational facilities throughout the state.”

The project also features a photovoltaic “mixer” space that acts as a gathering space for faculty and students. Other site improvements include a new canopy and covered walkway that create both outdoor learning spaces and increased accessibility between buildings, according to the news release.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • New Arizona Fine Arts School Reaches Construction Milestone

    Construction of the new Hilltop School for the Arts and Theater in Litchfield Park, Ariz., recently hit a significant milestone, according to a news release. The Agua Fria High School District held a beam-signing ceremony to celebrate the building’s topping out, or the placement of its last structural beam.

  • How a Portable Sink Helped an Art Classroom Run More Smoothly

    Classroom design decisions can have outsized effects on instructional time and safety at schools juggling mismatched infrastructure, strict budgets, and crowded schedules — particularly in the arts. Between spilled paint and dirty brushes, art classes run smoother with a sink in the studio. But many schools don’t have a sink in every art classroom.

  • Colorado School District Breaks Ground on Unified PK–12 Campus

    The Haxtun School District No. Re-2J in Haxtun, Colo., recently announced that ground has been broken on a renovation/addition project that will unite its two schools, Haxtun Elementary and Haxtun Jr/Sr High School, according to a news release.

  • Deferred Maintenance Issues Growing at Universities, Gordian Reports

    U.S. colleges and universities are falling increasingly behind on facilities maintenance and repair, according to Gordian’s 13th annual State of Facilities in Higher Education report. The deferred capital renewal burden has reached $156 per gross square foot, an 8% increase over the previous year.