University of West Florida Opens New Laboratory Facility

The University of West Florida recently announced that renovation work is complete on a new lab building for its campus in Pensacola, Fla., according to university news. Building 80 will serve as the home to the university’s civil engineering program and the Tyler Chase Norwood Construction Management Program. It features three new wet and dry labs for civil engineering and construction management students to become familiar with construction materials.

Amenities include the trade demonstration area, also called the construction yard, for project-based learning. It provides space for practical demonstrations and applications of masonry, carpentry, and welding. The soils lab was designed for research and experiments regarding soil and concrete mechanics.

“The upgraded facility reflects the University’s commitment to academic innovation and preparing graduates to meet regional and national workforce needs in design, construction and sustainability,” said Dr. Mohamed Khabou, dean of the Hal Marcus College of Science and Engineering. “Both the civil engineering and the construction management programs will produce highly qualified graduates to fill high paying jobs in the local economy.”

The renovation cost a total of $1.5 million, and funding came largely from a “handful of generous major donors.” The building was named after Tyler Chase Norwood, a 2015 graduate of UWF. Complementing the new facility, the Tyler Chase Norwood Construction Management Scholarship Endowment received a gift of $250,000 to expand educational opportunities for incoming students, the news release reports.

The building will open its doors to students for the fall 2025 semester.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Armstrong World Industries Acquires Geometrik

    Armstrong World Industries, designer and manufacturer of interior and exterior architectural applications like ceilings, walls, and metal solutions, recently announced its acquisition of Canada-based Geometrik, according to a news release. The British Columbian Geometrik specializes in designing and manufacturing wood acoustical and wall systems.

  • Empowering People Through Smart, Sustainable Campuses

    Sustainability is facing increasing scrutiny, with some questioning its costs and priorities. Yet for universities, it remains an essential driver of resilience, operational efficiency and long-term competitiveness. At the same time, there is a growing recognition that sustainable transformation is not just about reducing energy consumption and emissions to comply with tightening regulations ‒ it’s about creating vibrant, comfortable environments where people can thrive, innovate and connect. For university leadership, this is a complex balancing act, with rising energy costs and limited budgets only adding to the challenge.

  • University of Kansas Opens $400M Football Stadium Reconstruction

    The University of Kansas in Lawrence, Kan., recently announced that the $400-million reconstruction of David Booth Kansas Memorial Stadium is complete in time for the 2025 football season, according to a news release. The university partnered with Turner Construction Company on the project.

  • UC Riverside Completes $285M, Multi-School Student Housing Development

    The University of California, Riverside, recently announced the completion of a $285-million student housing complex offering 1,568 beds across 429 units, according to a news release.

Digital Edition