New Eagle Mountain High School Designed to Utilize Natural Features

Eagle Mountain High School

Eagle Mountain-Saginaw Independent School District's newly built Eagle Mountain High School has opened its doors to students for the first day of school. The facility, designed by VLK Architects and made possible by a voter-approved bond proposal passed in 2017, marks the Texas district's fourth comprehensive high school, with capacity for 2,400 students.

A key component of the architectural design was the determination to take advantage of the location's natural features, according to a news announcement. The site's hilly terrain, including a once-dry pond and dry creek bed, was retained and incorporated into the campus design. For example, the pond was filled with 37 million gallons of water for landscape irrigation, and an enclosed bridge was built over the dry creek bed, to allow students to cross between the school's academic wing, dining areas, fine arts spaces, and athletics facilities safely. In addition, the campus utilizes a geothermal mechanical system for energy savings and lower maintenance costs.

Specially designed learning spaces include classrooms for robotics, floral design, agriculture, and STEM labs; facilities for band, choir, art, dance, and theater programs; and athletic areas including a stadium, fieldhouse with an indoor practice facility and weightroom, and spaces dedicated to baseball, softball, gymnastics, cheer, soccer, and tennis.
  
"The process and thoughtfulness Eagle Mountain-Saginaw ISD places into district facilities reflects their stewardship of the entire community," said Lauren Brown, VLK principal-in-charge, in a statement. "Eagle Mountain High School's design supports the district's instructional needs, commitment to energy-efficient system design, and the implementation of cohesive, student-focused learning environments inside and outside. As EMHS develops their traditions and culture, the outcomes will be generational and will be for the greater good of the community that supported the vision and success of the young learners."

About the Author

Rhea Kelly is editor in chief for Campus Technology, THE Journal, and Spaces4Learning. She can be reached at [email protected].

Featured

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • Houston-Area High School Breaks Ground on 117,000SF Multi-Use Facility

    North Shore Senior High School, part of Galena Park ISD in Houston, Texas, recently broke ground on a new multi-use facility for student extracurriculars, according to a news release. The North Shore Multi-Use Facility will include dedicated practice and training space for the school’s athletics and fine arts programs.

  • Harvard Announces Replacement Facility for Native American Program

    Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP).

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.