New Eagle Mountain High School Designed to Utilize Natural Features

Eagle Mountain High School

Eagle Mountain-Saginaw Independent School District's newly built Eagle Mountain High School has opened its doors to students for the first day of school. The facility, designed by VLK Architects and made possible by a voter-approved bond proposal passed in 2017, marks the Texas district's fourth comprehensive high school, with capacity for 2,400 students.

A key component of the architectural design was the determination to take advantage of the location's natural features, according to a news announcement. The site's hilly terrain, including a once-dry pond and dry creek bed, was retained and incorporated into the campus design. For example, the pond was filled with 37 million gallons of water for landscape irrigation, and an enclosed bridge was built over the dry creek bed, to allow students to cross between the school's academic wing, dining areas, fine arts spaces, and athletics facilities safely. In addition, the campus utilizes a geothermal mechanical system for energy savings and lower maintenance costs.

Specially designed learning spaces include classrooms for robotics, floral design, agriculture, and STEM labs; facilities for band, choir, art, dance, and theater programs; and athletic areas including a stadium, fieldhouse with an indoor practice facility and weightroom, and spaces dedicated to baseball, softball, gymnastics, cheer, soccer, and tennis.
  
"The process and thoughtfulness Eagle Mountain-Saginaw ISD places into district facilities reflects their stewardship of the entire community," said Lauren Brown, VLK principal-in-charge, in a statement. "Eagle Mountain High School's design supports the district's instructional needs, commitment to energy-efficient system design, and the implementation of cohesive, student-focused learning environments inside and outside. As EMHS develops their traditions and culture, the outcomes will be generational and will be for the greater good of the community that supported the vision and success of the young learners."

About the Author

Rhea Kelly is editor in chief for Campus Technology, THE Journal, and Spaces4Learning. She can be reached at [email protected].

Featured

  • Minnesota Middle School Finishes $23.5M Addition and Modernization

    Highland Park Middle School in St. Paul, Minn., recently announced the completion of a $23.5-million addition and remodel project, according to a news release. Saint Paul Public Schools partnered with ATS&R Planners, Architects & Engineers for its design and Kraus-Anderson for its construction.

  • UNT Dallas Holds Ribbon-Cutting Ceremony for $100M STEM Building

    The University of North Texas at Dallas in Dallas, Texas, recently celebrated the opening of its new, $100-million STEM Building, according to local news. The ceremony on Dec. 2 preceded the first day of classes in the facility on Jan. 12, 2026.

  • Beyond Four Walls

    Operable glass walls provide a dynamic solution for educational spaces. They align with today’s evolving teaching methods and adapt to the needs of modern learners. Beyond the functional versatility, movable glass walls offer clean, contemporary aesthetics, slim and unobtrusive profiles, and versatile configurations that cater to the evolving needs of students and educators alike.

  • textured paper collage shows a school building on fire as a fire truck sprays water into the flames

    Why a Fire Loss Is More than Flames

    We've all seen what fire damage can do to a property, but the types of damage building owners often encounter after a fire loss can exceed expectations. Having full awareness of the different forms of damage properties can sustain helps owners respond faster, reduce continued damage, and get back on the road to recovery in short order.

Digital Edition