Minnesota K–12 District Completes New Elementary School

Rock Ridge Public Schools in Virginia, Minn., recently announced that construction of the district’s newest elementary school is complete. North Star Elementary cost $28.5 million and has the capacity for 600 students in grades 3–6, according to a news release. The district partnered with Kraus-Anderson Duluth for the project’s construction and BNDRY Studio for its design.

The project was part of a larger construction initiative after consolidating the Eveleth-Gilbert and Virginia school districts into Rock Ridge, the news release reports. The 79,000-square-foot facility stands three stories and takes the place of a former elementary and high school. Amenities include collaborative learning spaces, open-concept classrooms, and modernized technology and teaching resources.

The building’s second floor features an outdoor learning space via an open-air learning patio above the main commons area. Extending the building upward to minimize the building’s footprint and reclaim greenspace was the result of collaboration with the surrounding community. Construction began in spring 2022, according to the news release.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • CU-Lock Haven Receives $1.75M Gift for New Entrepreneurship, Media Center

    Commonwealth University-Lock Haven in Lock Haven, Penn., recently received a $1.75-million donation from entrepreneur and alumnus Nicholas Subich ’17, according to a university news release. The funds will go toward establishing the Nicholas Subich Center for Entrepreneurship and Media, a technology-driven hub for innovation and experiential learning.

  • Chicago District Completes Construction on New Elementary School

    North Chicago School District 187 in North Chicago, Ill., recently held a ribbon-cutting ceremony for the new Forrestal Elementary School, according to a news release. The new school marks a major investment in military-connected students and families at Naval Station Great Lakes.

  • Wold Architects & Engineers Acquires VPS Architecture

    Full-service planning, architecture, and engineering firm Wold Architects & Engineers recently announced that it has acquired VPS Architecture, according to a news release. The move will help strengthen Wold’s education and public-sector design expertise, industries in which both companies have strong pre-existing ties and relationships.

  • Harvard Announces Replacement Facility for Native American Program

    Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP).