Pick Everard Completes New Special Education School in England

Multidisciplinary consultancy Pick Everard recently announced that construction is complete on a new specialist school for students with Social, Emotional, and Mental Health (SEMH) needs in Shepshed, Leicestershire, England, according to a news release. Bowman Academy will open in September 2024 and serve students ages 4–16.

The academy will feature amenities like vinyl spaces for practical learning purposes, a sensory dark room, a calming room, and practical teaching spaces including a domestic kitchen and library. The school has capacity for 64 students, 16 primary-aged children (two ground-floor classrooms) and 48 secondary-aged children (two ground-floor classrooms and four more on the floor above).


Bowman Academy
Image courtesy of Pick Everard

“Working on SEND [Special Educational Needs and Disabilities] schools is always a privilege, with unique design applications and special consideration for the needs of a diverse range of learning,” said Joe West, Pick Everard associate. “Creating an environment that is both functional and comfortable for pupils was central to the aims of the project, which should in turn aid the school in attracting and retaining students in the area.”

The school also partnered with general contractor Bowmer + Kirkland for the project’s construction.

Sustainability initiatives include a “fabric-first” approach to increase insulation, heat recovery, and air-tightness. The school also features high-efficiency boilers, LED lighting with occupancy and daylight controls, and a photovoltaic panel array that offsets ten percent of the school’s energy consumption.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Nashville Elementary School Receives LEED Gold Certification

    Goodlettsville Elementary School, part of Metro Nashville Public Schools in Nashville, Tenn., recently achieved LEED Gold Certification from the U.S. Green Building Council (USGBC), according to a news release. The 81,750-square-foot school opened in 2023 and was designed by Goodwyn Mills Cawood (GMC).

  • Year-Round Schools Require Year-Round Indoor Air Quality Planning

    While many schools are out for the summer, year-round schools follow a more “balanced” schedule with shorter, more frequent breaks spaced throughout the school year. Even though this offers educational benefits, these facilities have less downtime for building maintenance. This can become an issue when facilities managers overlook the importance of routine HVAC maintenance and air duct cleaning services.

  • UT-San Antonio Begins Residence Hall Renovations

    The University of Texas at San Antonio recently began a $6-million renovation project to one of its residence halls, according to a news release. Originally completed in 1986, Chisolm Hall measures in at 120,860 square feet and is the oldest and largest residence hall on campus.

  • Back-to-School Playground Safety: 7 Common Hazards to Look for After Summer Break

    As summer break comes to an end, school administrators have plenty to prepare before students return. While classrooms, hallways and common areas often receive attention during all the back-to-school preparations, the playground should not be overlooked. Months of weather exposure, storms, and regular wear can leave behind hazards that may not be immediately noticeable.