Quam Launches Combination Paging and Fire Signaling Speaker

Commercial loudspeaker manufacturer Quam recently announced the release of its UL24 Series, a tile-replacement loudspeaker featuring both a paging speaker and a fire signaling speaker, according to a news release. The product was designed for educational, healthcare, and commercial markets both to save ceiling space and reduce the costs of installation.

“The main point of differentiation and focus for the UL24 Series is the labor savings of having one device in one location, providing dual applications,” said Quam Nichols President Randy Moore. “This product is transformative for systems integration projects in segments like education and healthcare, where ceiling space real estate is highly valuable.”

Key features and benefits include the dual functionality of a mass notification speaker connected to a fire panel and emergency communication system. The product is designed to fit a 2’x2’ lay-in ceiling tile space for efficiency. Its acoustic performance is boosted by two drivers and two different transformers. It also offers high durability and compliance with local fire codes. Finally, according to the news release, it can be installed within a ceiling tile grid in a matter of minutes.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Campus Safety Requires Using Every Resource Available

    Across the U.S., school and campus leaders are facing a security landscape that has changed dramatically over the past decade. Incidents on school property have increased in recent years, with several consecutive years setting record totals. According to analysis of data by CNN, dozens of shootings now occur on school grounds annually across K-12 and higher education environments.

  • Embry-Riddle Completes Construction on Research, Lab Facility

    Embry-Riddle Aeronautical University (ERAU) in Daytona Beach, Fla., recently announced the end of construction on a new research and lab facility on campus. The Center for Aerospace Engineering II (CAT II) will support aerospace research and technology development and broke ground last summer.

  • Deferred Maintenance Issues Growing at Universities, Gordian Reports

    U.S. colleges and universities are falling increasingly behind on facilities maintenance and repair, according to Gordian’s 13th annual State of Facilities in Higher Education report. The deferred capital renewal burden has reached $156 per gross square foot, an 8% increase over the previous year.

  • Minnesota District Opens New PreK–12 School

    Gibbon-Fairfax-Winthrop Schools in Gibbon, Minn., recently announced that construction is complete on a new, $68.9-million school for students in grades PreK–12, according to a news release.