Quam Launches Combination Paging and Fire Signaling Speaker

Commercial loudspeaker manufacturer Quam recently announced the release of its UL24 Series, a tile-replacement loudspeaker featuring both a paging speaker and a fire signaling speaker, according to a news release. The product was designed for educational, healthcare, and commercial markets both to save ceiling space and reduce the costs of installation.

“The main point of differentiation and focus for the UL24 Series is the labor savings of having one device in one location, providing dual applications,” said Quam Nichols President Randy Moore. “This product is transformative for systems integration projects in segments like education and healthcare, where ceiling space real estate is highly valuable.”

Key features and benefits include the dual functionality of a mass notification speaker connected to a fire panel and emergency communication system. The product is designed to fit a 2’x2’ lay-in ceiling tile space for efficiency. Its acoustic performance is boosted by two drivers and two different transformers. It also offers high durability and compliance with local fire codes. Finally, according to the news release, it can be installed within a ceiling tile grid in a matter of minutes.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Fayetteville State University Opens New Residence Hall

    Fayetteville State University (FSU) in Fayetteville, N.C., recently completed construction on a new $50-million residence hall, according to a news release. The university partnered with KWK/Jenkins • Peer Architects on the design of Bronco Pride Hall.

  • UCNJ Launches $30M Modernization of Physical Education Center

    The Union College of Union County (UCNJ) in Cranford, N.J., recently broke ground on a new $30-million modernization project for its Physical Education Center (PECK), according to a news release. The college partnered with DIGroup Architecture for the project’s design, transitioning the existing 42,000-square-foot structure into a campus hub for student athletics and campus life.

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

  • University of Kentucky Receives $150M Gift Toward New Arts District

    The University of Kentucky’s Board of Trustees recently received a $150-million gift from The Bill Gatton Foundation, according to a university news release, to build a new arts district on the campus in Lexington, Ky. The new district will feature a new College of Fine Arts building and a multi-hundred-seat theater, among other amenities.

Digital Edition