IMETCO Releases IntelliWrap PR Roofing Underlayment

IMETCO recently announced the release of the IntelliWrap PR self-adhering roofing underlayment, which provides a water- and air-tight, vapor-permeable seal for roofing systems. The product was designed for steep slopes (2:12 or more) of standing seam metal, clay tile, slate tile, cedar shingle roofs, and more. The vapor permeability allows building materials to dry more quickly, reducing the odds of moisture infiltration and damage, according to a news release.

The IntelliWrap PR underlayment can withstand temperatures of up to 250°F and meets ASTM E2178 air-barrier resistance. It’s compatible with substrates including fiberglass-reinforced gypsum sheathing board, rigid insulation, plywood, steel, aluminum, galvanized metal, and OSB, the news release reports.

 “With its slip-resistant, UV-stable surface, the new IntelliWrap underlayment facilitates safe installation while offering a vapor-permeable barrier that allows the roof assembly to breathe,” said Jonnie Hasan, P.E., IMETCO director of engineering and sales support. “It bonds fully without the use of primers and is simple to install with no special tool requirements.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • DLR Group Appoints New K–12 Education Practice Leader

    Integrated design firm DLR Group recently announced that it has named its new global K–12 Education leader, Senior Principal Carmen Wyckoff, AIA, LEED AP, according to a news release. Her teams have members in all 36 of the firm’s offices in the U.S., Puerto Rico, the U.S. Virgin Islands, Europe, and Asia.

  • El Paso District Breaks Ground on New Elementary School

    The Canutillo Independent School District in El Paso, Texas, recently announced that construction has begun on a 119,000-square-foot elementary school, according to a news release. The district partnered with Pfluger Architects, Carl Daniel Architects, and LDCM Solutions on the new Davenport Elementary School, which has an expected completion date of 2027.

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.

  • LAN, Inc. Opens Office in College Station, Texas

    Lockwood, Andrews & Newnam, Inc. (LAN) recently announced the opening of a new office in College Station, Texas, to support its regional client base, according to a news release. The organization provides engineering, design, and program management services for water, wastewater, transportation, stormwater, and education clients in the Brazos Valley.

Digital Edition