IMETCO Releases IntelliWrap PR Roofing Underlayment

IMETCO recently announced the release of the IntelliWrap PR self-adhering roofing underlayment, which provides a water- and air-tight, vapor-permeable seal for roofing systems. The product was designed for steep slopes (2:12 or more) of standing seam metal, clay tile, slate tile, cedar shingle roofs, and more. The vapor permeability allows building materials to dry more quickly, reducing the odds of moisture infiltration and damage, according to a news release.

The IntelliWrap PR underlayment can withstand temperatures of up to 250°F and meets ASTM E2178 air-barrier resistance. It’s compatible with substrates including fiberglass-reinforced gypsum sheathing board, rigid insulation, plywood, steel, aluminum, galvanized metal, and OSB, the news release reports.

 “With its slip-resistant, UV-stable surface, the new IntelliWrap underlayment facilitates safe installation while offering a vapor-permeable barrier that allows the roof assembly to breathe,” said Jonnie Hasan, P.E., IMETCO director of engineering and sales support. “It bonds fully without the use of primers and is simple to install with no special tool requirements.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Full Sail University Announces First Student Housing Facility

    Full Sail University in Winter Park, Fla., recently announced that development has begun on its first student housing community, according to a news release. The university is partnering with Nvision Development for construction and long-term management of the facility, which will stand five stories and have the capacity for more than 570 beds.

  • Academy of Classical Education Breaks Ground in Louisiana

    Charter Schools USA (CSUSA) recently announced the groundbreaking of a new public charter school in Covington, La., according to a news release. The Academy of Classical Education at Covington will enroll students in grades K–8 and is scheduled for completion in August 2026, just in time for the new school year.

  • Arizona District Breaks Ground on Community Training, Learning Center

    The Tolleson Union High School District (TUHSD) in Tolleson, Ariz., recently broke ground on a new Training & Learning Center (TLC) for both district professionals and the community at large, according to a news release. The 90,000-square-foot facility has an estimated completion date of spring 2027.

  • University of Pittsburgh to Build New Residence Hall

    The Board of Trustees from the University of Pittsburgh in Pittsburgh, Penn., recently approved the construction of a new residence hall for first-year students, according to university news.