TCU Completes Construction on New Medical School Building

Texas Christian University in Fort Worth, Texas, recently completed construction on a new home for the Anne Burnett Marion School of Medicine, according to a news release. Arnold Hall, standing four stories and covering 95,000 square feet, is the university’s first major off-campus development. The university partnered with CO Architects and Hoefer Welker for the project’s design, and Linbeck Group for its construction.

Basic amenities include a commons area, classrooms, a library, and administrative space. Anatomy, experimental, and medical simulation labs will come equipped with augmented VR technology, the news release reports. There will be also dedicated space for clinical skills training.

“We designed the medical school building with a clear vision of cultivating the next generation of healthcare leaders within an inclusive and forward-thinking environment,” said Travis Leissner, AIA, Hoefer Welker principal and director of strategy. “We’re proud to say that we executed this by creating a space that will foster world-class education utilizing innovative technology and collaborative spaces where medical students will establish the foundation for their careers. The work curated alongside our project partners and the university will undoubtedly make a significant impact on students, faculty professionals, the greater community of Fort Worth, and beyond.”

Arnold Hall stands in downtown Fort Worth, setting an anchor for potential future development. The project team worked with city officials to establish the training facility near urban medical districts within its growing bioscience sector.

“This medical school will be a significant contributor to Fort Worth’s economy and growth as a city where medical innovation happens,” said Stuart D. Flynn, M.D., founding dean of the Burnett School of Medicine. “We love the proximity to all of our clinical partners in the Near Southside Medical Innovation District and look forward to deepening those connections. Arnold Hall is more than the new home for the Burnett School of Medicine. It also communicates TCU’s commitment to creating dynamic state-of-the-art facilities for next-generation medical education, where students now have access to cutting-edge technology and facilities that will pair with a curriculum that balances wellness, knowledge and the growth of students.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Spaces4Learning Trends & Predictions for Educational Facilities in 2026: Part II

    As education leaders look toward 2026, the design of K–12 and higher education facilities is being reshaped by powerful, converging forces. Survey respondents point to the rapid growth of Career and Technical Education, deeper alignment with workforce and industry needs, and the accelerating influence of AI and emerging technologies.

  • Utah Valley University Opens New Engineering Building

    Utah Valley University in Orem, Utah, recently held a grand-opening ceremony for the new Scott M. Smith Engineering Building, according to a news release. The facility is one of the largest engineering buildings in the state at almost 200,000 square feet, and it plays home to the university’s Smith College of Engineering and Technology (SCET).

  • How a Portable Sink Helped an Art Classroom Run More Smoothly

    Classroom design decisions can have outsized effects on instructional time and safety at schools juggling mismatched infrastructure, strict budgets, and crowded schedules — particularly in the arts. Between spilled paint and dirty brushes, art classes run smoother with a sink in the studio. But many schools don’t have a sink in every art classroom.

  • Houston K–12 District Opens New Elementary School

    The Lamar Consolidated Independent School District (Lamar CISD) recently announced the completion of a new elementary school in a western suburb of Houston, Texas, according to a news release. Haygood Elementary School measures in at 110,000 square feet, has the capacity for 854 students, and is the first of three new schools scheduled to be built in the Cross Creek West community.