Wenger Corporation Publishes Theater Rigging Guide

Wenger Corporation, which provides solutions for performing arts and music education spaces, recently launched a free educational resource guide, “Rigging Guide for Performance Spaces.” The 32-page e-book is available on the company website and provides a background in the technical knowledge required to help administrators and educators make decisions in the planning process. Its purpose is to boost the skills and knowledge of individuals (ranging from beginners to professionals) who are involved in theater rigging projects, according to a news release.

The book’s introduction provides an overview of a new theater’s planning process, including the standard project timeline and planning team. The Beginner section covers the six basic theater types, usual line set breakouts, and a rigging overview. The Advanced section covers the four types of rigging, instruction photos and illustrations, different hoist types, rigging control systems, safety guidelines, and fire safety. Finally, the Appendix features a glossary, more illustrations, and recommended mounting dimensions, the news release reports.

“Our J.R. Clancy brand has been a pioneer in theatre rigging since 1885,” said Wenger Corporation President and CEO Dave Thomas. “Our Rigging Guide can assist design professionals and end users by providing foundational knowledge and a common vocabulary, enabling all team members to collaborate more effectively. With our extensive experience and dedication to advancing the industry, we are excited to offer this updated resource.”

The Rigging Guide is just one among a series of free educational resources for facilities planning in school music, performance space, and athletic storage facilities.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • A digital silhouette works at a computer, immersed in a glowing, interconnected world

    How Will AI Transform Learning Space Design?

    For years, higher education has designed learning spaces around technology as a tool for display, capture, collaboration, and connectivity. AI changes that equation.

  • Deferred Maintenance Issues Growing at Universities, Gordian Reports

    U.S. colleges and universities are falling increasingly behind on facilities maintenance and repair, according to Gordian’s 13th annual State of Facilities in Higher Education report. The deferred capital renewal burden has reached $156 per gross square foot, an 8% increase over the previous year.

  • New City School

    Turning Crisis into Opportunity: Transforming New City School

    When New City School in St. Louis suffered catastrophic flood damage in July 2022, the event could have marked a serious setback for the 100-year-old institution. Instead, it became a forward-looking opportunity.

  • UT System Approves First Funds for New Campus

    The University of Texas System Board of Regents recently approved funds to build the first facility of a new campus in far west Fort Worth, Texas, according to university news. UTA West will serve as a branch of the University of Texas at Arlington and is scheduled to open in fall 2028.